Replace #2 Intake Screens <br />The #2 intake screens were installed in 1949. Replacement of these screens will increase efficiency and meet <br />upcoming fish protection regulations expected to become more stringent. Requirements for the new screens <br />will be studied prior to design and construction of the facility. <br />Engineering $ 15,000 <br />Labor $ 27,000 " SDC Funded $ 0 <br />New Stainless Steel Screens $ 95,000 Rate Funded Capital $165,000 <br />Other Material $ 8,000 <br />Equipment $ 5,000 <br />.Administration 15 000 <br />Total $165,000 <br />Replace Raw Water Pumping Check Valves <br />There aze 8 existing check valves'on the raw water pumps that need of replaced. This job serves to replace 6 <br />check valves. <br />Labor $24,000 SDC Funded $ 0 <br />Equipment $50,000 Rate Funded Capital $89,000 <br />Administration 15 000 Funds Spent (2002) $49,000 <br />Total , $89,000 <br />