~ ~ ~ ~ ~ Unfunded Pro'ects <br /> Stormwater ~ <br /> ~._..:,~~u~~~,._~.~~ ~.._~.~s_~~o...~m <br /> ~ .1 <br /> I _ <br /> in thousands of dollars <br /> 3._~. <br /> l - <br /> ~ Riverview and Augusta Pipe Construct a 450 ft 24" CSP that runs under the west shoulder <br /> ~ Improvements (LH07) of Riverview Rd. from the southeast corner of the property at - <br /> 1878 Riverview to the front of 1600 Riverview; it then turns <br /> Plan/Policy Document• east and crosses under Riverview until connecting with ~ <br /> • structure 68819 on the west side of Augusta Rd. <br /> Stormwater Master Plan;subbasin LHRA ~ <br /> ~ <br /> Costs: <br /> ~ 2012 Total ~ <br /> Capital $60 $60 f.. <br /> Total $60 $60 <br /> i <br /> Riverview/Augusta Minor Develop apre-design of a storm drainage system for this <br /> Storm Drainage System area of the Laurel Hill Basin <br /> (Pre-Design) (LH08) <br /> Plan/Policy Document: <br /> ~ ~l <br /> Stormwater Master Plan; subbasin LHRA <br /> f ) <br /> ~ Costs: % ~ <br /> 2012 Total <br /> Capital $48 $48 E~_~.1 <br /> Total $48 $48 i <br /> t <br /> Roosevelt Channel -Culvert Replace the existing pipe with a bridge (20' wide x 55' long) <br /> Replacement and reconstruct the channel to match the size and shape of <br /> the downstream open waterway. <br /> Plan/Policy Document: <br /> Stormwater Basin Plans <br /> Costs: ~ ~ 1 <br /> 2012 Total ' ' <br /> Capital $192 $192 <br /> Total $192 $192 <br /> i <br /> i <br /> <br /> 1 <br /> City of Eugene 2006-2011 Capital Improvement Program <br /> 122 <br /> <br />