Stormwater Unfunded Projects <br /> , <br /> ~ F..,:.. r:w-;ate ~ F~~ ~ ~W ~.rL~~~.~..~.~~,....w.~,~~..u_ <br /> in thousands of dollars <br /> _m _ <br /> ~ Willow Creek East Branch This capital project includes the following culvert <br /> Culvert Improvements replacements: segment WCEA060F (41 ft 36" CMP replaced <br /> (WC3C4) by 36" CSP at a steeper slope); segment WCEA050C (51 ft <br /> j Plan/Policy Document: 30" x 42" CMP replaced by 27" CSP); segment WCEA0306 <br /> (164 ft 24" CSP replaced by 36" CSP 0; and segment <br /> Stormwater Master Plan; subbasin WCEA WCEA060D (2-18" and a 36" CMPs replaced with a 3' x 5' <br /> box culvert). <br /> ' Costs: <br /> ~ 2012 Total <br /> Capital $70 $70 <br /> Total $70 $70 <br /> Windsor Circle Pipe This capital project includes includes the following pipe <br /> Improvements (AM27B) replacements: segment AMBH070A (515 ft 66" CSP) <br /> replaced by 72" CSP; and segmebt AMBH070B (1272 ft 54" <br /> Plan/Policy Document: CSP) replaced by 66" CSP. <br /> Stormwater Master Plan; subbasin AMBH <br /> Costs: <br /> 2012 Total <br /> Capital $919 $919 <br /> Total $919 $919 <br /> t. <br /> ~ . <br /> <br /> i <br /> <br /> I f <br /> 1, . <br /> t,. <br /> ~ -1 <br /> City of Eugene 2006-2011 Capital Improvement Program <br /> ( 123 <br /> _ _ <br /> <br />