Stormwater Unfunded Projects <br /> j <br /> er ~~`~~:,:",,;,~s".....~~>...-.«.k».~.:~.._.~~~~~`.~_.,..~av..:~..~~...~"`c..,~,...~...a`~°~"'"4--'.~;:,:~Ww~-"\.e.,y = ,r~,~°........~.. _.w`m~,..w..m'~...~.=s< ...,.a:=+'i-~•... <br />.~ <br /> in thousands of dollars <br /> I <br /> - <br /> ,g. <br /> Morse Ranch Park Pipe This capital project includes the following pipe replacements: <br /> - Improvement (AM14) AMMDO80A to AMMD080H (18' to 36" CSPs along 29th Ave. <br /> from Charnelton St. to Oak);AMMDO70B (27" along 29th <br /> i" Plan/Policy Document• Ave. from Oak to Amazon Creek). All of these pipe segments <br /> • are replaced by 42" CSPs. AMMDO70A (30" along 29th Ave. <br /> Stormwater Master Plan; subbasin AMMD from Oak to Amazon Creek) is replaced by a 48" CSP. <br /> I <br /> Costs: <br /> 2012 Total <br /> Capital $1,054 $1,054 <br /> ~ Total $1,054 $1,054 <br /> '~1 <br /> Mt. Cavalry Pipe Improvements This capital project includes the following pipe replacements: <br /> (AMO8B) AMUP180A (1314 ft 36" along 33rd from High St. to Amazon <br /> Creek replaced by 48" CSP); AMUP180B (215 ft 36" replaced <br /> Plan/Policy Document: by 48" CSP); AMUP180C (1254 ft 30" along 33rd from <br /> Willamette to east of High St. replaced by 36"). <br /> Stormwater Master Plan; subbasinAMUP <br /> ! <br /> - , Costs: <br /> 2012 Total <br /> ~ ~ Capital $763 $763 <br /> Total $763 $763 <br /> . ~ <br /> t <br /> <br /> . . <br /> Mt. Cavalry Water Quality Construct a 6 ac-ft water quality facility at Mt Cavalry <br /> Facility (AMO8D) Cemetery. This capital project also requires residential land <br /> acquistion of approximately 2 acres. <br /> ( Plan/Policy Document: <br /> . Stormwater Master Plan; subbasin AMUP <br /> i <br /> ~ Costs: <br /> l 2012 Total <br /> Capital $469 $469 <br /> ` Operating: Facility $6 $6 <br /> ' Total $475 $475 <br /> City of Eugene 2006-2011 Capital Improvement Program <br /> 121 <br /> <br />