New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2006-11 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2006-11 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:05:31 AM
Creation date
6/1/2009 12:30:01 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2011
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> { ~ ~ - ~ . ~ e <br /> <br /> I ~ r Unfunded Projects <br /> Stormwate <br /> a <br /> in thousands of dollars <br /> i , <br /> ~k ~ ~ <br /> ~18 _ . <br /> e <br /> Hilyard St. Pipe Improvements This capital project includes the following pipe ~ <br /> j (AMil) improvements: segments AMUP140C, 140D and 140E which <br /> - run parallel to 36th Ave just west of Hilyard are replaced by `l <br /> Plan/Policy Document• 42" CSPs (design capacity is 173 cfs); tip-up AMUP140A and <br /> • pipe segements 1408 which run from Hilyard St. to Amazon ' ' <br /> Stormwater Master Plan Creek are re-graded (design capacity is 134 cfs) and <br /> I replaced by 54" CSPs. <br /> Costs: <br /> j 2012 Total <br /> Capital $290 $290 <br /> Total $290 $290 <br /> i <br /> Hunsaker -Culvert Replace the pipe under Hunsaker Lane with a 4' X 5' box - <br /> Replacement culvert. a`~ ~ <br /> ~ <br /> Plan/Policy Document: <br /> j 1 <br /> CSWMP, Stormwater Basin Plans <br /> <br /> i <br /> Costs: <br /> 2012 Total <br /> Capital $26 $26 ~ <br /> Total $26 $26 r"~~ <br /> c 'S <br /> ~ Hunsaker -Open Channel Construct open channel .improvements upstream and <br /> Improvement downstream of Hunsaker Lane. <br /> Plan/Policy Document: <br /> CSWMP, Stormwater Basin Plans <br /> Costs: <br /> 2012 Total <br /> Capital $398 $398 <br /> Total $398 $398 <br /> <br /> i <br /> City of Eugene 2006-2011 Capital Improvement Program <br /> 120 , _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.