<br /> { ~ ~ - ~ . ~ e <br /> <br /> I ~ r Unfunded Projects <br /> Stormwate <br /> a <br /> in thousands of dollars <br /> i , <br /> ~k ~ ~ <br /> ~18 _ . <br /> e <br /> Hilyard St. Pipe Improvements This capital project includes the following pipe ~ <br /> j (AMil) improvements: segments AMUP140C, 140D and 140E which <br /> - run parallel to 36th Ave just west of Hilyard are replaced by `l <br /> Plan/Policy Document• 42" CSPs (design capacity is 173 cfs); tip-up AMUP140A and <br /> • pipe segements 1408 which run from Hilyard St. to Amazon ' ' <br /> Stormwater Master Plan Creek are re-graded (design capacity is 134 cfs) and <br /> I replaced by 54" CSPs. <br /> Costs: <br /> j 2012 Total <br /> Capital $290 $290 <br /> Total $290 $290 <br /> i <br /> Hunsaker -Culvert Replace the pipe under Hunsaker Lane with a 4' X 5' box - <br /> Replacement culvert. a`~ ~ <br /> ~ <br /> Plan/Policy Document: <br /> j 1 <br /> CSWMP, Stormwater Basin Plans <br /> <br /> i <br /> Costs: <br /> 2012 Total <br /> Capital $26 $26 ~ <br /> Total $26 $26 r"~~ <br /> c 'S <br /> ~ Hunsaker -Open Channel Construct open channel .improvements upstream and <br /> Improvement downstream of Hunsaker Lane. <br /> Plan/Policy Document: <br /> CSWMP, Stormwater Basin Plans <br /> Costs: <br /> 2012 Total <br /> Capital $398 $398 <br /> Total $398 $398 <br /> <br /> i <br /> City of Eugene 2006-2011 Capital Improvement Program <br /> 120 , _ <br /> <br />