- Stormwater Unfunded Projects <br /> in thousands of dollars <br /> 8 ® 8 <br /> Beaver St &Hunsaker Ln Stormwater system improvements related to Lane County <br /> Stormwater Improvements road improvements to Beaver St. and Hunsaker Ln. between <br /> - Division and River Rd. <br /> ' ~ Plan/Policy Document: <br /> CSWMP, Stormwater Basin Plans; Lane <br /> County CIP <br /> 'i <br /> _ Costs: <br /> 2012 Total <br /> Capital $50 $50 <br /> ~ <br /> Total $50 $50 <br /> r'__~ <br /> Bell Ave. Pipe Improvements This capital project includes pipe replacements for the <br /> following segments: BDA2400B (replaces a 36" CSP with a <br /> 48" CSP), BDA24000 through BDA2400E (replace a 30" CSP <br /> Plan/Policy Document• with a 42" CSP), and BDA2400F and BDA2400G (replace the <br /> 21" and 30" CSPs with 36 CSPs). <br /> Stormwater Master Plan; subbasin BDA2 <br /> Costs: <br /> 2012 Total <br /> Capital $795 $795 <br /> ( '1 Total $795 $795 <br /> Greenhill Tributary Culvert Replace the existing 48" culvert with a 8' x 5' concrete box <br /> Replacement culvert (1005 LF) <br /> Plan/Policy Document: <br /> _ ' Stormwater Master Plan; subbasin BDGH <br /> f,. <br /> Costs: <br /> ~ . 2012 Total <br /> Capital $941 $941 <br /> Total $941 $941 <br /> <br /> i, <br /> <br /> i <br /> City of Eugene 2006-2011 Capital Improvement Program <br /> 119 <br /> <br />