i <br /> r <br /> i <br /> i <br /> Stormwater Unfunded Projects <br /> in thousands of dollars <br /> e _ <br /> Lower Willow Creek Relocate, realign and restore the main stem of Willow Creek <br /> Restoration WCO8 <br /> ( ) to its historic conditions to the extent feasible. This includes <br /> the portions of the east and west branches north of W. 18th <br /> Plan/Policy Document• to .the point where they historically converged; and then <br /> ~ from this convergence of the two branches north to W.11th. <br /> Stormwater Master Plan; subbasinWCMN Construct a low flow channel for these sections of the open j <br /> waterway and protect the floodplain for Willow Creek along <br /> i this historical channel alignment. l <br /> Costs: ` _ _1 <br /> 2012 Total <br /> i <br /> Capital $920 $920 <br /> Operating: Facility $12 $12 <br /> Total $932 $932 <br /> I <br /> i <br /> Sam Reynolds St. Water Quality Construct a 5.5 acre-ft neighborhood water quality facility on ~ <br /> Facility (AM29) the east side of Sam Reynolds Street. This capital project . <br /> j also requires acquisition of approximately 1.5 acres of <br /> industrial property. - <br /> Plan/Policy Document: <br /> ~ Stormwater Master Plan; subbasin AMBT <br /> i <br /> I <br /> <br /> j Costs: <br /> 2012 Total <br /> Capital $487 $487 <br /> Operating: Facility $6 $6 <br /> Total $493 $493 <br /> I <br /> ~ <br /> City of Eugene 2006-2011 Capital Improvement Program <br /> 118 <br /> i <br /> <br />