New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2006-11 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2006-11 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:05:31 AM
Creation date
6/1/2009 12:30:01 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2011
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
~ ~ Unfunded Pro •ec <br /> Stormwater ~ <br /> ~ ,-..c::-~^=.- r. i~Ma~'~.^, <br /> c~.C.. ;m3.,. Fm~,..,~~~~;. .._.._....~~:".~;w~;.w..,...,.~:s~..,...Y. H`,.~W`:...?"v~.~...sr..:.,'e"ac _ <br /> in thousands of dollars <br /> ~y ~ <br /> _..T.. <br /> ~ $ <br /> ~ e , <br /> , ; <br /> Greenhill Tributary Water Construct a 10 ac-ft neighborhood water quality facility <br /> Quality Facility where two open waterway segments enter the upstream end <br /> of culvert BDGH070A (48" CSP) <br /> Plan/Policy Document: <br /> i <br /> Stormwater Master Plan; subbasin BDGH <br /> ~ COSts: <br /> 2012 Total <br /> Capital $749 $749 <br /> ' Operating: Facility $11 $11 <br /> i'~) Total $760 $760 <br /> - Hawkins Ln. Water Quality Construct an 8.5 ac-ft water quality facility on the west side <br /> Facility of Hawkins Lane, south of 25th Ave. at the upstream end of <br /> segment AMBH120C. This capital project also requires about <br /> Plan/Policy Document• 2 acres of residential land acquisition. <br /> Stormwater Master Plan;subbasin AMBH <br /> ~ <br /> Costs: <br /> 2012 Total <br /> Capital $625 $625 <br /> Operating: Facilit $10 $10 <br /> Total $635 $635 <br /> 4 <br /> l <br /> Laurelwood Flood Control Construct a 6 ac-ft flood control facility at node 54260 <br /> Facility/Pipe Improvements (northwest end of the golf course). The construction of this <br /> (AM15B) facility requires about 1.5 acres of commercial land <br /> Plan/Policy Document: acquisition. <br /> f.. Stormwater Master Plan; subbasin AMMD This capital project also includes the following pipe <br /> . replacements: AMMD040A (961 ft long parallel 60" CSPs) <br /> and AMMD0406 (486 ft long 42" and 72" elliptical) replaced <br /> ' by 2894 ft long parallel 72" CSPs. <br /> Costs: <br /> ~ 2012 Total <br /> Capital $2,008 $2,008 <br /> Operating: Facilit $5 $5 <br /> Total $2,013 $2,013 <br /> , <br /> <br /> ' <br /> City of Eugene 2006-2011 Capital Improvement Program <br /> 117 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.