~e <br /> ' StOrmWater Unfunded Projects <br /> ~ in thousands of dollars <br /> <br /> I <br /> i <br /> a c- <br /> i <br /> Ascot Park Open Waterway This capital. project consists of open waterway improvements <br /> Modification(WK16A) for segments WKNB190A, WKNB150B and WKNB150C. <br /> <br /> ! Waterway improvements include the removal of sediment <br /> ~ and regrading of the waterway slope to improve the <br /> Plan/Policy Document: <br /> hydraulic capacity. Also segment WKNB150A1 a 42" CSP <br /> Stormwater Master Plan Subbasin WKNB (node 61030 to 61081) was removed and replaced with a i <br /> 42" CSP at a reduced slope. <br /> <br /> ~ <br /> j Costs: <br /> 2012 Total ~ <br /> Capital $72 $72 <br /> Total $72 $72 <br /> ~ <br /> i <br /> I ~ <br /> Ayres Pond Outfall Retrofit Install a stormwater quality structure (CDS) upstream of the <br /> outfall to Ayres Pond to remove large debris from the _ <br /> inaccessible lower portions of the open channel. Retrofit the ~ <br /> i Plan/Policy Document• existing outfall structure with a larger concrete pad and <br /> • energy dissipaters. i ,i <br /> _1 <br /> CSWMP; Stormwater Basin Plans <br /> Costs: i~ <br /> 2012 Total <br /> Capital $348 $348 - <br /> Total $348 $348 i <br /> i <br /> I i <br /> i <br /> Empire Park Pond Retrofit Construct a 2 ac-ft sediment forebay for stormwater ~ } <br /> discharges into the pond and enhance the natural resources <br /> of the existing pond area (approximately 2.1 acres) through ` ' <br /> Plan/Policy Document• sediment removal and revegetation. The sediment forebay <br /> • would prevent debris and coarse sediments from discharging <br /> Stormwater Master Plan; subbasin BDA2 into the pond and would facilitate maintenance access for <br /> removal of this material <br /> Costs: <br /> 2012 Total t, <br /> Capital $394 $394 <br /> Total $394 $394 <br /> City of Eugene 2006-2011 Capital Improvement Program <br /> 116 <br /> _ _ <br /> <br />