New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2002-07 Eugene CIP (2)
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2002-07 Eugene CIP (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:02:40 AM
Creation date
6/1/2009 12:29:53 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2007
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Stormwater <br />Pine View Neighborhood Facility Construct a 4 ac-ft neighborhood water quality facility upstream of the Pine View <br />development outfall. <br />Plan/Policy Document: CSWMP; Stormwater Basin Plans <br />Total Project Cost: $309,000 <br />Polk Street Water Quality Facilities Construct off-line, underground water quality facilities for this existing piped <br />drainage system. Funds previously budgeted for preliminary design. Final design <br />and construction in FY02. <br />Plan/Policy Document: CSWMP, Stormwater Basin Plans <br />Total Project Cost: $207,000 <br />River Point Pond Outlet Channel Construct an open waterway drainage system from River Point Pond to the McKenzie <br />River. Funds previously budgeted for preliminary design. Design delayed due to <br />environmental issues. Final design and construction FY03. <br />Plan/Policy Document Stormwater Basin Plans <br />Total Project Cost $275,000 <br />Royal Node Stormwater Infrastructure Enhance existing open waterways to achieve multiple benefits including <br />conveyance, waterqualiry, and natural enhancements. <br />Plan/Policy Document: CSWMP; Stormwater Basin Plans, Royal Node Plan <br />Total Project Cost $1,399,000 <br />Water Quality Facilities -High Source Areas Construct offline, underground structural water quality facilities in developed, high <br />pollutant source areas. <br />Plan/Policy Document CSWMP; Stormwater Basin Plans <br />Total Project Cost $900,000 <br />Stormwater Rehabilitation/Imarovements <br />Ayres Pond Outfall Retrofit Install a Stormwater quality structure (CDS) upstream of the outfall to Ayres Pond to <br />remove large debris from the inaccessible lower portions of the open channel. <br />Retrofit the existing outfall structure with a larger concrete pad and energy dissipaters. <br />Plan/Policy Document CSWMP; Stormwater Basin Plans <br />Total Project Cost $774,000 <br />City of Eugene 2002-2007 Capital Improvement Program <br />53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.