New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2002-07 Eugene CIP (2)
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2002-07 Eugene CIP (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:02:40 AM
Creation date
6/1/2009 12:29:53 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2007
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Stormwater <br />General Stormwater Rehabilitation Rehabilitate, reconstruct and install Stormwater system where needed due to various <br />problems, such as deterioration due to age, poor materials, localized flooding, and/or <br />systems limitations. Where feasible, natural systems are used to address existing <br />problems in conformance with CSWMP. <br />Plan/Policy Document: Public Facilities Plan & Services; Comprehensive <br />Stormwater Management Plan; Stormwater Basin Plans <br />Total Project Cost: $2,400,000 <br />Outfall Stabilization Retrofit storm drainage system outfalls which are creating bank stability problems <br /> along the Amazon Creek and the Willamette River within the City of Eugene. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $750,000 <br />Retrofit Empire Park Pond Construct a 2 ac-ft sediment forebay for Stormwater discharges into the pond and <br /> enhance the natural resources of the existing pond area (approximately 2.1 acres) <br /> through sediment removal and revegetation. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $57,000 <br />Streambank Stabilization <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $900,000 <br />Tip-up Retrofits Retrofit the tip-ups with manholes that provide sedimentation storage and improved <br /> maintenance access. <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans <br /> Total Project Cost: $750,000 <br />Channel Easement Acquisition <br />Channel Easement Acquisition Acquire right of way and/or easements along waterways to facilitate access for <br /> maintenance purposes and/or for waterway protection or restoration. <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans <br /> Total Project Cost: $900,000 <br />City of Eugene 2002-2007 Capital Improvement Program <br />54 <br />
The URL can be used to link to this page
Your browser does not support the video tag.