Stormwater <br />General Stormwater Rehabilitation Rehabilitate, reconstruct and install Stormwater system where needed due to various <br />problems, such as deterioration due to age, poor materials, localized flooding, and/or <br />systems limitations. Where feasible, natural systems are used to address existing <br />problems in conformance with CSWMP. <br />Plan/Policy Document: Public Facilities Plan & Services; Comprehensive <br />Stormwater Management Plan; Stormwater Basin Plans <br />Total Project Cost: $2,400,000 <br />Outfall Stabilization Retrofit storm drainage system outfalls which are creating bank stability problems <br /> along the Amazon Creek and the Willamette River within the City of Eugene. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $750,000 <br />Retrofit Empire Park Pond Construct a 2 ac-ft sediment forebay for Stormwater discharges into the pond and <br /> enhance the natural resources of the existing pond area (approximately 2.1 acres) <br /> through sediment removal and revegetation. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $57,000 <br />Streambank Stabilization <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $900,000 <br />Tip-up Retrofits Retrofit the tip-ups with manholes that provide sedimentation storage and improved <br /> maintenance access. <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans <br /> Total Project Cost: $750,000 <br />Channel Easement Acquisition <br />Channel Easement Acquisition Acquire right of way and/or easements along waterways to facilitate access for <br /> maintenance purposes and/or for waterway protection or restoration. <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans <br /> Total Project Cost: $900,000 <br />City of Eugene 2002-2007 Capital Improvement Program <br />54 <br />