Stormwater <br />Martin Drive Pipe Improvements Replace existing pipe under Martin Drive with a larger pipe. Existing pipe capacity <br />is deficient under existing conditions. <br />Plan/Policy Document: Stormwater Basin Plans <br />Total Project Cost: $93,000 <br />River Road -Stormwater Stormwater system improvements related to County road improvement project at <br />River Road (Carthage Avenue to Beacon Drive). <br />Plan/Policy Document: CSWMP, Stormwater Basin Plans; Lane County CIP <br />Total Project Cost: $50,000 <br />Roosevelt Channel -Culvert Replacement Replace the existing pipe with a bridge (20' wide x 55' long) and reconstruct the <br />channel to match the size and shape of the downstream open waterway. <br />Plan/Policy Document: Stormwater Basin Plans <br />Total Project Cost: $192,000 <br />Services for New Development Capacity enhancements for new developments as needed. <br />Plan/Policy Document: SDC Policy; CSWMP <br />Total Project Cost: $600,000 <br />New Caaital Facilities <br />Augusta/1-5 Water Quality Facility Construct a 20 ac-ft regional water quality facility adjacent to I-5. <br />Plan/Policy Document: CSWMP; Stormwater Basin Plans <br />Total Project Cost: $1,245,000 <br />Kinney Park Neighborhood Facility Restore flow to the historical channel through a newly constructed culvert and <br />construct a 7 ac-ft neighborhood water quality facility in Kinney Park. <br />Plan/Policy Document: CSWMP; Stormwater Basin Plans <br />. Total Project Cost: $660,000 <br />Minor System between Riverview/Augusta Improve the minor drainage system between Riverview & Augusta. <br />Plan/Policy Document: .Stormwater Basin Plans; CSWMP <br />Total Project Cost $60,000 <br />City of Eugene 2002-2007 Capital Improvement Program <br />52 <br />