New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2002-07 Eugene CIP (2)
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2002-07 Eugene CIP (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2009 8:02:40 AM
Creation date
6/1/2009 12:29:53 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2007
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Stormwater <br />Capacity Enhancement <br />3rd-4th Connector Stormwater Improvements Stormwater improvements related to upgrade and capacity enhancements for 3rd <br />Avenue from Pearl Street to Lincoln Street just north of the railroad tracks. <br />Plan/Policy Document: CWSMP; Stormwater Basin Plans <br />Total Project Cost: $120,000 <br />Greenhill Tributary Storm Improvements Funds previously,budgeted for Phase I design to address flooding problem in <br />Greenhill tributary. Phase I construction in FY02. Phase II design for water quality <br />and natural resources enhancements in FY03 and FY04. Phase II construction in <br />FY05 and FY06. <br />Plan/Policy Document: CSWMP; Stormwater Basin Plans <br />Total Project Cost: $1,704,000 <br />Hilyard Street Pipe Improvements Replace existing pipes under Hilyard Street and just west of Hilyard with large pipes <br />to address capacity problem. <br />Plan/Policy Document: CSWMP, basin plans <br />Total Project Cost: $131,000 <br />Hunsucker -Open Channel Improvements Construct open channel improvements upstream and downstream of Hunsucker Lane. <br />Plan/Policy Document: CSWMP, Stormwater Basin Plans <br />Total Project Cost: $398,000 <br />Hunsucker Culvert Replacement Replace the pipe under Hunsaker Lane with a 4'x5' box culvert. <br />Plan/Policy Document: CSWMP, Stormwater Basin Plans <br />Total Project Cost: $26,000 <br />Irvington Drive -Stormwater Stormwater system improvements related to County road improvements to Irvington <br />Drive (River Road to Prairie Road). <br />Plan/Policy Document: CSWMP, Stormwater Basin Plans; Lane County CIP <br />Total Project Cost: $100,000 <br />Lenox/Salty -Culvert Replacement Replace the existing culvert with 7' diameter pipe. <br />Plan/Policy Document: CSWMP, Stormwater Basin Plans <br />Total Project Cost: $172,000 <br />City of Eugene 2002-2007 Capital Improvement Program <br />51 <br />
The URL can be used to link to this page
Your browser does not support the video tag.