Stormwater <br />Capacity Enhancement <br />3rd-4th Connector Stormwater Improvements Stormwater improvements related to upgrade and capacity enhancements for 3rd <br />Avenue from Pearl Street to Lincoln Street just north of the railroad tracks. <br />Plan/Policy Document: CWSMP; Stormwater Basin Plans <br />Total Project Cost: $120,000 <br />Greenhill Tributary Storm Improvements Funds previously,budgeted for Phase I design to address flooding problem in <br />Greenhill tributary. Phase I construction in FY02. Phase II design for water quality <br />and natural resources enhancements in FY03 and FY04. Phase II construction in <br />FY05 and FY06. <br />Plan/Policy Document: CSWMP; Stormwater Basin Plans <br />Total Project Cost: $1,704,000 <br />Hilyard Street Pipe Improvements Replace existing pipes under Hilyard Street and just west of Hilyard with large pipes <br />to address capacity problem. <br />Plan/Policy Document: CSWMP, basin plans <br />Total Project Cost: $131,000 <br />Hunsucker -Open Channel Improvements Construct open channel improvements upstream and downstream of Hunsucker Lane. <br />Plan/Policy Document: CSWMP, Stormwater Basin Plans <br />Total Project Cost: $398,000 <br />Hunsucker Culvert Replacement Replace the pipe under Hunsaker Lane with a 4'x5' box culvert. <br />Plan/Policy Document: CSWMP, Stormwater Basin Plans <br />Total Project Cost: $26,000 <br />Irvington Drive -Stormwater Stormwater system improvements related to County road improvements to Irvington <br />Drive (River Road to Prairie Road). <br />Plan/Policy Document: CSWMP, Stormwater Basin Plans; Lane County CIP <br />Total Project Cost: $100,000 <br />Lenox/Salty -Culvert Replacement Replace the existing culvert with 7' diameter pipe. <br />Plan/Policy Document: CSWMP, Stormwater Basin Plans <br />Total Project Cost: $172,000 <br />City of Eugene 2002-2007 Capital Improvement Program <br />51 <br />