~Stormwater <br />tThese totals are not fund-specific and include all programmed funds. For information about specific funds and detailed project funding for <br />FY2002 and FY2003 , refer to the Two Year Fund Detail on the previous page(s). <br />Description of Funded Projects <br />Restoration <br />Delta Ponds Habitat Enhancements .Restoration project in partnership with ACOE to enhance habitat and stormwater <br />quality in Delta Ponds. Funds previously budgeted for preliminary engineering. <br />Preliminary engineering continues in FY02. Final design and construction FY03 and <br />FY04. <br />Plan/Policy Document: CSWMP, Natural Resources Assessment for Delta Ponds; <br />stormwater Basin Plans <br />Total Project Cost $1,640,000 <br />Eugene Millrace Restoration Restore the piped segment of the Eugene Millrace along the main stem of the <br />Willamette River. <br />Plan/Policy Document: CSWMP, stormwater Basin Plans <br />Total Project Cost: $2,501,000 <br />Wetland Mitigation Bank Enhancement, restoration, and/or creation of wetlands on various sites in West <br />Eugene to continue the mitigation bank that allows for the balance of development <br />with impact to wetlands. Mitigation work in advance of development will result in <br />certified credits to be sold to developers. <br />Plan/Policy Document: West Eugene Wetlands Plan, MOA between City of <br />Eugene, BLM, Corps, EPA, DEQ, & DSL <br />Total Project Cost: $900,000 <br />Willamette River Bank Restoration Repair and enhance banks of Willamette River at Skinner Butte Park. <br />Plan/Policy Document: CSWMP; Federal Priorities 2000, stormwater Basin Plans <br />Total Project Cost: $1,000,000 <br />Willow Creek West Branch Culvert/Channel Replace culverts along West Branch of Willow Creek. <br />Plan/Policy Document: CSWMP, stormwater Basin Plans <br />Total Project Cost: $36,000 <br />City of Eugene 2002-2007 Capital Improvement Program <br />50 <br />