New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2002-07 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2002-07 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:10:03 PM
Creation date
6/1/2009 12:29:23 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2007
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Stormwater <br /> Pine View Neighborhood Facility Construct a 4 ac-ft neighborhood water quality facility upstream of the Pine View <br /> developmenYOUtfall. <br /> - PlanlPolicy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $309,000 <br /> Polk Street Water Quality Facilities Construct off-line, underground water quality facilities for this existing piped <br /> ` drainage system. Funds previously budgeted for preliminary design. Final design <br /> and construction in FY02. <br /> PlanlPolicy Document: CSWMP, Stormwater Basin Plans <br /> ` ; Total Project Cost: $207,000 <br /> 1 River Point Pond Outlet Channel Construct an open waterway drainage system from River Point Pond to the McKenzie <br /> . River. Funds previously budgeted for preliminary design. Design delayed due to <br /> environmental issues. Final design and construction FY03. <br /> PlanlPolicy Document: Stormwater Basin Plans <br /> Total Project Cost: $275,000 <br /> 1 Royal Node Stormwater Infrastructure Enhance existing open waterways to achieve multiple benefits including <br /> conveyance, water quality, and natural enhancements. <br /> PlanlPolicy Document: CSWMP; Stormwater Basin Plans, Royal Node Plan <br /> Total Project Cost: $1,399,000 <br /> Water Quality Facilities -High Source Areas Construct offline, underground structural water quality facilities in developed, high <br /> pollutant source areas. <br /> PlanlPolicy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $900,000 <br /> - <br /> l Stormwater Rehabilitation/Improvements <br /> , <br /> ' Ayres Pond Outfall Retrofit Install a stormwater quality structure (CDS) upstream of the outfa(I to Ayres Pond to <br /> remove large debris fromthe inaccessibleJower portions of the open channel. <br /> Retrofit the existing outfall structure with a larger concrete pad and energy dissipaters. <br /> , <br /> " PlanlPolicy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $774,000 <br /> t, <br /> I,, <br /> ti <br /> Gity of Eugene 2002-2007 Capital improvement Program <br /> <br /> i <br /> 53 <br /> <br /> l`'~ <br /> <br /> ( <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.