New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2002-07 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2002-07 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:10:03 PM
Creation date
6/1/2009 12:29:23 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2007
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Stormwater <br /> Martin Drive Pipe Improvements Replace existing pipe under Martin Drive with a larger pipe.. Existing pipe capacity <br /> is deficient under existing conditions. - <br /> PIan/Policy Document: Stormwater Basin Plans <br /> Total Project Cost: $93,000 <br /> I <br /> ~1 <br /> River Road -Stormwater Stormwater system improvements related to County road improvement project at <br /> River Road (Carthage Avenue to Beacon Drive). <br /> Plan/Policy Document: CSWMP, Stormwater Basin Plans; Lane County CIP <br /> ~ Total Project Cost: $50,000 ' <br /> i <br /> i <br /> Roosevelt Channel -Culvert Replacement Replace the existing pipe with a bridge (20' wide x 55' long) and reconstruct the <br /> channel to match the size and shape of the downstream open waterway. <br /> PIan/Policy Document: Stormwater Basin Plans <br /> Total Project Cost: $192,000 <br /> Services for New Development Capacity enhancements for new developments as needed. <br /> Plan/Policy Document: SDC Policy; CSWMP l <br /> Total Project Cost: $600,000 <br /> i <br /> i <br /> New Capital Facilities <br /> Augusta/1-5 Water Quality Facility Construct a 20 ac-ft regional water quality facility adjacent to I-5. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost: $1,245,000 <br /> I'i <br /> Kinney Park Neighborhood Facility Restore flow to the historical channel through a newly constructed culvert'and <br /> construct a 7 ac-ft neighborhood water quality facility in Kinney Park. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> ( ~1 <br /> <br /> 1 Total Project Cost:. $660,000 <br /> Minor System between Riverview/Augusta Improve the minor drainage system between Riverview & Augusta. <br /> PlanlPolicy Document:. Stormwater Basin Plans; CSWMP <br /> Total Project Cost $60,000 ~ <br /> ~ <br /> City of Eugene 2002-2007 Capital Improvement Program <br /> 52 <br /> I,, <br /> _ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.