New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2002-07 Eugene CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2002-07 Eugene CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 12:10:03 PM
Creation date
6/1/2009 12:29:23 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Miscellaneous
PW_Subject
CIP
Document_Date
6/30/2007
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> Stormwater <br /> General Stormwater. Rehabilitation Rehabilitate, reconstruct and install Stormwater system where needed due to various <br /> problems, such as deterioration due to age, poor materials, localized flooding, and/or <br /> systems limitations. Where feasible, natural systems are used to address existing <br /> problems in conformance with CSWMP. <br /> Plan/Policy Document: Public Facilities Plan & Services; Comprehensive <br /> Stormwater Management Plan; Stormwater Basin Plans <br /> Total Project Cost: $2,400,000 <br /> Outfall Stabilization Retrofit storm drainage system outfalls which are creating bank stability problems <br /> along the Amazon Creek and the Willamette River within the City of Eugene. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans , <br /> Total Project Cost $750,000 <br /> ~ Retrofit Empire Park Pond .Construct a 2 ac-ft sediment forebay for Stormwater discharges into the pond and <br /> enhance the natural resources of the existing pond area (approximately 2.1 acres) <br /> through sediment removal and revegetation. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost $57,000 <br /> Streambank Stabilization <br /> Plan/Policy Document CSWMP; Stormwater Basin Plans <br /> <br /> j Total Project Cost $900,000 <br /> i <br /> T"ip-up Retrofits Retrofit the tip-ups with manholes that provide sedimentation storage and improved <br /> maintenance access. <br /> i <br /> Plan/Policy Document CSWMP, Stormwater Basin Plans <br /> Total Project Cost $750,000 <br /> i,. <br /> Channel Easement Acquisition <br /> ChanneF Easement Acquisition Acquire right of way and/or easements along waterways to facilitate access for ; <br /> maintenance purposes and/or for waterway protection or restoration. <br /> Plan/Policy Document CSWMP, Stormwater Basin Plans <br /> I, <br /> T a1 Project t 900 000 <br /> of Cos $ <br /> 1 <br /> , <br /> City of Eugene 2002-2007 Capital Improvement Program <br /> 54 <br /> - <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.