i <br /> Stormwater <br /> General Stormwater. Rehabilitation Rehabilitate, reconstruct and install Stormwater system where needed due to various <br /> problems, such as deterioration due to age, poor materials, localized flooding, and/or <br /> systems limitations. Where feasible, natural systems are used to address existing <br /> problems in conformance with CSWMP. <br /> Plan/Policy Document: Public Facilities Plan & Services; Comprehensive <br /> Stormwater Management Plan; Stormwater Basin Plans <br /> Total Project Cost: $2,400,000 <br /> Outfall Stabilization Retrofit storm drainage system outfalls which are creating bank stability problems <br /> along the Amazon Creek and the Willamette River within the City of Eugene. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans , <br /> Total Project Cost $750,000 <br /> ~ Retrofit Empire Park Pond .Construct a 2 ac-ft sediment forebay for Stormwater discharges into the pond and <br /> enhance the natural resources of the existing pond area (approximately 2.1 acres) <br /> through sediment removal and revegetation. <br /> Plan/Policy Document: CSWMP; Stormwater Basin Plans <br /> Total Project Cost $57,000 <br /> Streambank Stabilization <br /> Plan/Policy Document CSWMP; Stormwater Basin Plans <br /> <br /> j Total Project Cost $900,000 <br /> i <br /> T"ip-up Retrofits Retrofit the tip-ups with manholes that provide sedimentation storage and improved <br /> maintenance access. <br /> i <br /> Plan/Policy Document CSWMP, Stormwater Basin Plans <br /> Total Project Cost $750,000 <br /> i,. <br /> Channel Easement Acquisition <br /> ChanneF Easement Acquisition Acquire right of way and/or easements along waterways to facilitate access for ; <br /> maintenance purposes and/or for waterway protection or restoration. <br /> Plan/Policy Document CSWMP, Stormwater Basin Plans <br /> I, <br /> T a1 Project t 900 000 <br /> of Cos $ <br /> 1 <br /> , <br /> City of Eugene 2002-2007 Capital Improvement Program <br /> 54 <br /> - <br /> <br />