Transportation -Six-Year Funded Program (Cont.) <br />-, <br />Neighborhood Traffic Calming* Funds neighborhood traffic calming projects for local residential streets, including <br />speed humps, diverters, chokers, circles, and other local street enhancements. <br />Program addresses neighborhood traffic problems which are prioritized with the <br />assistance of neighborhood organizations.* <br />Plan/Policy Document: TransPlan <br />Total Project Cost: $0 <br />On-Street Parking Improvements Upgrade parking areas within the public right-of--way, including upgrading meter <br />clocks, maintaining meter supply, painting, and new landscaping. <br />Plan/Policy Document: TransPlan <br />Total Project Cost: $100,000 <br />Priority Sidewalk Installation Projects Install new sidewalks based on the sidewalk priority rating system in the adopted City <br />of Eugene Sidewalk Program. <br />Plan/Policy Document: TransPlan Policy, TRIP, City Sidewalk Program <br />Total Project Cost: $1,500,000 <br />Right-0f-Way Purchases* Purchase portions of new public right-of-way.* <br />Plan/Policy Document: TransPlan Policy <br />Total Project Cost: $0 <br />Sidewalk Access Ramps* Install sidewalk access ramps at intersection corners and other needed access locations <br />throughout the City, including the installation of new ramps and reconstruction of <br />existing ramps to comply with ADA and City standards.* <br />Plan/Policy Document: TransPlan Policy, ADA Regulations <br />Total Project Cost: $0 <br />Street & Sidewalk Improvements Non-assessable share of petitioned and City-initiated street, sidewalk and stormwater <br />and wastewater channel improvement projects. This funding is distinguishable from <br />SDC's which are used primarily for needed non-assessable infrastructure capacity to <br />support growth in the community. <br />Plan/Policy Document: City Code, TransPlan Policy, Storm Sewer Master Plan, <br />Sanitary Sewer Master Plan <br />Total Project Cost: $480,000 <br />Street Lighting (Residentiaq* Install new or upgraded street lights along local streets and in residential areas. <br />.Locations are based on a priority system that incorporates crime activity, lighting <br />needs, location and the availability of power.* <br />Plan/Policy Document: Street Light Priority List, TransPlan <br />Total Project Cost: $0 <br />Street Tree Stocking & Planting Program* Plant street trees in City areas needing new trees and where street trees were removed <br />due to damage or disease.* <br />Plan/Policy Document: TransPlan Policy, Street Tree Program <br />Total Project Cost: $0 <br />'These projects have been included as Funded in prior CIPs. However, due to reductions in the Road Fund, it is anticipated that these projects <br />will receive no funding until such time as replacement revenue can be obtained. <br />Cjty of Eugene • 1998-2003 Capital Improvement Program <br />Project and Program Areas -Transportation <br />51 <br />