PATTERSON STREET UNDERPASS <br />ESTIMATE OF PROBABLE CONSTRUCTION COST <br />Roadways, Drainage, Utility Relocation, and Site Dewatering <br />it 4. _ 1~, <br />SECTION <br />Patterson Street/8th Avenue/Avenue A (Underpass) City <br />Eugene <br />KING OF WORK <br />Street Improvements/Drainage/Utility Relocation KEY NUMBER LENGTH GATE <br />5i25~2ooa PREPAREG 6Y <br />Heather Fuller <br />Description: Depressed roadway and undercrossing structures <br />B.1. ITEM UNIT AMOUNT UNIT <br />COST TOTAL O <br />K COMMENT <br />ROADWAY <br /> PATTERSON STREET <br /> MOBILIZATION LS 1 $44,206.00 $44,206 <br /> ROADWAY LS 1 $211,260 $211,260 <br /> SIDEWALK LS 1 $42,000 $42,000 <br /> ILLUMINATION LS 1 $13,800 $13,800 <br /> TRAFFIC SIGNAL LS 1 $175,000 $175,000 <br /> SUBTOTAL LS $4$6,266 <br /> 8TH AVENUE <br /> MoBluurioN Ls 1 $16,785.00 $16,785 <br /> ROADWAY LS 1 $118,277 $118,277 <br /> SIDEWALK LS 1 $25,200 $25,200 <br /> ILLUMINATION LS 1 $24,370 $24,370 <br /> SUBTOTAL $184,632 <br /> AVENUE A (Underpass) <br /> MOBILIZATION LS 1 $31,497.00 $31,497 <br /> ROADWAY LS 1 $280,173 $280,173 <br /> SIDEWALK LS 1 $21,000 $21,000 <br /> ILLUMINATION LS 1 $13,800 $13,800 <br /> SUBTOTAL $346,470 <br /> ROADWAY SUBTOTAL $1,017,368 <br />DR AINAGE <br /> PATTERSON STREET <br /> DRAINAGE-SURFACE WATER LS 1 $85,750.00 $85,750 <br /> STORMWATER PUMPING STATION LS 1 $452,500.00 $452,500 <br /> SUBTOTAL $538,250 <br /> 8TH AVENUE <br /> DRAINAGE-SURFACE WATER LS 1 $34,700.00 $34,700 <br /> AVENUE A (Underpass) <br /> DRAINAGE-SURFACE WATER LS 1 $151,475.00 $151,475 <br /> DRAINAGE SUBTOTAL $724,425 <br />UTI LITY RELOCATION <br /> 8TH AVENUE LS $213,000 <br />SIT E DEWATERING <br /> SITE DEWATERING LS 1 $772,000 $772,000 <br />ROADWAY TOTAL - ~ . <br />Patterson Underpass Roadway 2004 Cost Estimate 0609041 1 6/22/2004, 2:42 PM <br />