New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
EWEB/New Triad Hospital Relocation Transportation Analysis Report
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
EWEB/New Triad Hospital Relocation Transportation Analysis Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 11:35:15 AM
Creation date
6/1/2009 12:27:13 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Transportation
PW_Subject
Transportation Analysis
Document_Date
6/30/2004
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PATTERSON UNDERPASS <br />ESTIMATE OF PROBABLE CONSTRUCTION COST <br />Bridges, Retaining Walls, and Rail Construction <br />i~,, <br /> <br />~, <br />`\~, i <br />SECTION <br />Patterson Street Underpass Clty <br />Eugene <br />KIND OF WORK <br />Structures, Retaining Walls, and Rail KEY NUMBER LENGTH GATE <br />sr25~2ooa PREPARED BY <br />Lwin Hwee <br />Description: Depressed roadway and undercrossing structures <br />B.i. ITEM UNIT AMOUNT UNIT <br />COST TOTAL O <br />K COMMENT <br />STRUCTURES <br /> HWY. 99 UNDERCROSSING <br /> SUPERSTRUCTURE-THRU GIRDER LS 1 421,400 $421,400 <br /> UPRR UNDERCROSSING <br /> SUPERSTRUCTURE-FIAT SLAB LS 1 $459,200 $459,200 <br /> RETAINING WALLS <br /> CONVENTIONAL REINFORCED CONCRETE CANTILEVER WALL SF 1 $1,000,000 $1,000,000 <br /> STRUCTURES SUBTOTAL $1,$$0,600 <br />UPRR RAILROAD IMPROVEMENTS <br /> sHOOFLV Ls 1 $1,000,000 $1,000,000 <br /> MAIN-LINE RECONSTRUCTION LS 1 $40,000 $40,000 <br /> REMOVAL OF EXISTING 8TH AVENUE CROSSING LS 1 $30,000 $30,000 <br /> UPRR RAILROAD IMPROVEMENTS SUBTOTAL $1,070,000 <br />STRUCTURES AND RAILTOTAL $2,950,600 <br />Patterson Underpass Structure Rail 2004 Cost Estimate 060904 1 6/15/2004, 4:13 PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.