SURFACE MAINTENANCE SUPERVISOR AND CREW <br /> The Surface Maintenance Work Section is located in Building #6. The supervisor is located in <br /> an office (room # 009). The crew is located in room #010. <br /> PARKS MAINTENANCE WORK SECTION <br /> Most of the Parks Maintenance Work Section is located in Building #6 with a few exceptions. <br /> This section is made up of four working units: Park Amenities and Volunteers, Tree <br /> Maintenance and Planning, Landscape, Medians and Hendricks and Turf and Grounds. The <br /> section manager and two of the work units are located in Building #6. The other two are housed <br /> in other buildings. The section manager has an office (room #006) and two of the supervisors <br /> each have offices (rooms #001 & 008). The Park Amenities and Volunteers share a crew room <br /> with Natural Resource Maintenance in crew room #003 and Turf and Grounds crew is located in <br /> crew room #005. The Tree Planning and Maintenance are in split locations, residing in Building <br /> #2 and #12 respectively. <br /> NATURAL RESOURCE MAINTENANCE <br /> ` The Natural Resource Maintenance supervisor occupies an office (room #007). The Natural <br /> Resource crew shares crew room #003 with the Parks Amenities and Volunteers. <br /> SAFETY COORDINATOR <br /> The Safety Coordinator is in the Traffic Section but is currently located in an office in Building #6 <br /> j (room #020). <br /> COPIER ROOM <br /> This space (room # 016) is used for copier and associated equipment. <br /> <br /> - PARTIAL KITCHEN AND MAIN HALL <br /> The partial kitchen has a refrigerator, vending machine, sink and cabinets (room #002). <br /> RESTROOMS <br /> Restroom facilities are provided in Building #6. <br /> BUILDING SEVEN <br /> This building primarily is used to provide storage of the combination machines and storage of <br /> spill response and park materials and supplies. <br /> BUILDING EIGHT <br /> This building is used to store materials and supplies. It is shared by the Tree Maintenance and <br /> Stormwater Maintenance Crews. <br /> BUILDING NINE <br /> This building primarily is used to provide storage for street and path barricades, traffic control <br /> and misc. work zone materials. <br /> BUILDING TEN <br /> Building #10 is used to store street repair supplies and materials for the Surface Maintenance <br /> Crews. <br /> BUILDING ELEVEN <br /> Building #11 is primarily occupied Wastewater Maintenance Crew with a small area designated <br /> to the Medians and Landscape Crew. Primarily the wastewater Vactor trucks and Tv trucks are <br /> parking in the bays while a major portion is used to store materials and supplies. <br /> Facilities Master Plan -January 2004 <br /> III -10 <br /> <br />