New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Roosevelt Yard Facilities Master Plan
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Roosevelt Yard Facilities Master Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 1:09:59 PM
Creation date
6/1/2009 12:26:03 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Maintenance
PWA_Project_Area
Miscellaneous
PW_Subject
Roosevelt Yard
Document_Date
1/31/2004
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
OPEN WATERWAY SUPERVISOR AND STAFF <br /> The Open Waterway Supervisor and three staff on this work team are located in Building #2. <br /> The supervisor is located in office #033, while each staff has an assigned cubical (#019, 021 & <br /> 031). <br /> SURFACE TECHNICAL SUPERVISOR AND STAFF <br /> The Surface Technical Supervisor and five staff of the 8 FTE assigned to this work section are <br /> housed in Building #2 and a portion of Building #3. The Surface Technical Supervisor has an <br /> office (room #044), while each of the five staff resides in an office cubical (#036, 037, 038, 039, <br /> 040 & 031). Building #2 also houses the `tool crib' stockroom, tool check-out, and warehouse <br /> purchasing counter (rooms #041 & 042). The Surface Technical work unit has three seasonal <br /> staff during the summer months with limited designated space (room #043) thus creating <br /> additional seasonal workspace demands. <br /> <br /> i <br /> ? ~ BUILDING THREE <br /> Building #3 primarily houses staff from Surface Technical and Open Waterway, restrooms, Turf <br /> and Grounds irrigation materials, supplies and parking. <br /> SURFACE TECHNICAL STAFF <br /> " ~ Two Surface Technical staff are located in Building #3. Staffs perform computer support for the <br /> Roosevelt Yard. Each h s a de i n d work c# 1 <br /> a s ate sae 0 6 & 017 <br /> g p ( ) <br /> OPEN WATERWAY STAFF <br /> There are two Open Waterway Staff is located in Building #3. One staff shares computer <br /> support for the Roosevelt Yard (#018). The second staff is in charge of the Stream Team <br /> Program who has a private office (room #011). <br /> MISC. <br /> Restrooms (room #014, 012 & 009) <br /> TURF AND GROUND MATERIALS, SUPPLIES AND PARKING <br /> (room #001 - 007) <br /> ~ <br /> BUILDING FOUR <br /> Building #4 is primarily used for storage for Fleet tires (002 - 009), traffic control signs (010) and <br /> tools for the Parks Volunteer programs (001). <br /> BUILDING FIVE <br /> ` Building #5 has a combined use. It is primarily used to store vehicles (room #003 - 012), <br /> irrigation materials and supplies (room #001 & 002) and has the Workout Facility (room # 013, <br /> 014 & 015) on the east end. <br /> BUILDING SIX <br /> Building #6 primarily houses the entire Sub-Surface Work Section, Surface Maintenance <br /> Supervisor and crew, the entire Parks Maintenance Work Section, Safety Coordinator, copier <br /> room, a partial kitchen and restroom facilities. <br /> SUB-SURFACE WORK SECTION <br /> The Sub-Surface Work Section is located in Building#6 and is made up of three work units: <br /> Stormwater, Wastewater and Technical. The section manager has an office (room # 015). <br /> There are also three supervisory offices (room #021, 026 & 027) and two crew rooms. The <br /> j Stormwater crew is located in crew room #022, Wastewater crew is located in crew room #024 <br /> and Technical staff is located in room #'s 012, 013 & 014. <br /> Facilities Master Plan -January 2004 <br /> III - 9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.