New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Roosevelt Yard Facilities Master Plan
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Roosevelt Yard Facilities Master Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2009 1:09:59 PM
Creation date
6/1/2009 12:26:03 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Maintenance
PWA_Project_Area
Miscellaneous
PW_Subject
Roosevelt Yard
Document_Date
1/31/2004
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Remove or Relocate Building #22 <br />• (Was placed on site after 2001 Master Plan draft) <br />New Fleet Shop (SW corner of site) <br />• Replaces inadequate and seismically unsound garage portion of Building #1 <br />• Easy access for all City vehicles from Garfield Street. <br />• Not necessary for City vehicles to penetrate interior of site. <br />• Building can be designed with efficient drive through bays <br />• Include New Radio Shop <br />Additional Fuel Station (W of New Fleet Shop) <br />• Convenient access for all City vehicles <br />• Can add alternative fuel(s) <br />• Maintain existing fuel station for PW use. <br />Additional Vehicle Wash (E of New Fleet Shop) <br />• Convenient access for all City vehicles <br />• Maintain existing wash station for PW use <br />Remove Part Building #1 <br />• Garage portion is inefficient <br />• The building is used to service essential vehicles, but is seismically inadequate. <br />New Administration Building (NW corner of site) <br />• Relocates certain administrative functions, primarily from Building #1. <br />• Public interface occurs at new building. <br />• Allows relocation of Technical Staff from Buildings #2 and #3 to Building #1 <br />Public Parking (NE of New Administration Building) <br />• For Public use. <br />Public Works Stormwater Demonstration Project (E of New Administration Building) <br />• A park like setting for the public interface with Public Works <br />Renovation Part of Building #1 (N side of building) <br />• Houses Technical staff relocated from buildings #2 and #3 <br />• Some of building available for storage <br />.BERRY ARCHITECTS, P.C. XI - 2 <br />Facilities Master Plan -January 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.