Remove or Relocate Building #22 <br />• (Was placed on site after 2001 Master Plan draft) <br />New Fleet Shop (SW corner of site) <br />• Replaces inadequate and seismically unsound garage portion of Building #1 <br />• Easy access for all City vehicles from Garfield Street. <br />• Not necessary for City vehicles to penetrate interior of site. <br />• Building can be designed with efficient drive through bays <br />• Include New Radio Shop <br />Additional Fuel Station (W of New Fleet Shop) <br />• Convenient access for all City vehicles <br />• Can add alternative fuel(s) <br />• Maintain existing fuel station for PW use. <br />Additional Vehicle Wash (E of New Fleet Shop) <br />• Convenient access for all City vehicles <br />• Maintain existing wash station for PW use <br />Remove Part Building #1 <br />• Garage portion is inefficient <br />• The building is used to service essential vehicles, but is seismically inadequate. <br />New Administration Building (NW corner of site) <br />• Relocates certain administrative functions, primarily from Building #1. <br />• Public interface occurs at new building. <br />• Allows relocation of Technical Staff from Buildings #2 and #3 to Building #1 <br />Public Parking (NE of New Administration Building) <br />• For Public use. <br />Public Works Stormwater Demonstration Project (E of New Administration Building) <br />• A park like setting for the public interface with Public Works <br />Renovation Part of Building #1 (N side of building) <br />• Houses Technical staff relocated from buildings #2 and #3 <br />• Some of building available for storage <br />.BERRY ARCHITECTS, P.C. XI - 2 <br />Facilities Master Plan -January 2004 <br />