` XI -FACILITY NEEDS <br />CURRENT AND FUTURE NEEDS <br />Following is a list outlining current and future needs addressed in the 20 year Master Plan. <br />The projects are presented in related groups separated by horizontal lines. Some projects <br />within the groups must be phased in a particular order. For example, Buildings #4 an #5 must <br />be removed before Building #6 is expanded. <br />FACILITY NEEDS <br />Remove Buildings #4 and #5 <br />• #4 had Facility Condition Index (FCI) of 1.05 in 2001 Study (means repairs would cost 105% of <br />replacement) <br />• #5 had FCI of .62 in 2001. <br />• These buildings are in the way of expansion of Building #6. <br />Expand Building #6 <br />• Provides additional crew room space and shower and locker rooms. <br />Staff Parking <br />• Additional staff parking accessible from Garfield Street <br />• Rework existing parking off Roosevelt Blvd. to meet City standards (landscaping, etc}. <br />PW Yard & Materials Storage <br />• Central storage space in center of site; easily accessible <br />• Some storage area can remain at SE part of site <br />New Vehicle Parking Building (S E Corner of site) <br />• Similar to Building #18. (May need to be shorter than #18 if nearby recycle ramp remains) <br />• Could replace Building #4 and #5. <br />Remove Building #8 <br />• Small building in way of efficient vehicle circulation <br />BERRY ARCHITECTS, P.C. XI - I <br />Facilities Master Plan -January 2004 <br />