New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Amazon Park Concept Design
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Amazon Park Concept Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:55:29 AM
Creation date
6/1/2009 12:25:09 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
POS
PWA_Project_Area
Miscellaneous
PW_Subject
Amazon Park
Document_Date
2/15/2005
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• There are no defined alternatives for baseball while there are numerous <br />alternatives for soccer. <br />• Keep the backstop and 90' baseball field.. Use outfields for soccer and keep the <br />softball field. <br />• No expansion of sports fields- do not mitigate the natural areas. <br />• No parking on grass for pool use. Take. a bigger view of the issue focus on <br />preserving natural space. <br />• I would not the jogging trail. <br />• No sports field expansion. There isn't enough parking for existing high volume <br />active recreation. Amazon Park is a unique opportunity for medium scale natural <br />habitat within town, accessible by foot. <br />• No ballfield period. <br />• Open space- not hardened ballfields. <br />• Moving the east side of running path to east side of creek would allow easier <br />maintenance and better transition from grove to creek. <br />• .Remove ash grove boardwalk. <br />• Remove pedestrian bridge. <br />• Plantings around tennis court. <br />• I really like the proposed design. <br />• No they were great. Emphasis on riparian restoration and native plant <br />establishment is great, but somewhat excessive. <br />• Extra running trail <br />• No tennis addition. Another restroom instead. <br />• The connection across Amazon parkway seems important. <br />• Get the running trail less muddy on the .east side. <br />• Take off overflow parking. City code states that all parking areas must be paved. <br />Space is too tight to set aside land for few days a year parking. <br />• No parking, improvement of athletic fields, winterizing pool, dog parking <br />improvements. Move Adidas trail to east side of creek with two bridges. <br />4)' What do you like best about the concept diagrams (what should not be <br />changed)? <br />• .Small ticket items are great, and we need the multi-use fields if it drains. <br />• Plantings along bike path. Park circulation. Active recreation, diverse uses is <br />great. <br />• More native species, bridges for peds and bikes. <br />• New fields. <br />• Sports fields. Balanced development. <br />• The mobile field. <br />• Multi-use fields. <br />• Multi-use fields. <br />• Remove baseball field. <br />• Multi-use field, eliminate baseball field. <br />• Scheme represents all park resources <br />• Not moving west side jogging path <br />• More soccer fields. <br />. • Most of available funds should go toward recreation/ athletic fields. <br />• Athletic fields, restrooms, parking. <br />• Native plant buffer between fields and paths/ creek. <br />Amazon Park 11/20/03 <br />Workshop 2 Questionnaire Results Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.