• Flexible fields. <br />• Efforts to restore native plants, protect wetlands, ash grove, and creek meander. <br />• I will only support additional parks measures when the city abandons the WEP <br />and overbuilding natural areas. <br />• Creek profile/ meander revisions. <br />• Increased sidewalks. Unlocked restroom. Pool open all year. <br />• Access across Amazon Parkway. Pedestrian bridge. Landscaping, winterize <br />pool <br />• Natural enhancements. Extend to east side of creek too (running trail). <br />• Open space improvements <br />• Wetland restoration. <br />• That there is still a place for sports fields. <br />• Natural resource improvements. <br />• General improvements and natural resource projects. <br />• Increase of native plantings. <br />• Improved access (Hilyard crossing, foot bridge, parkway crossing). Creek profile/ <br />meander provisions. <br />5) Since limited funding is available, please list your top 3 priorities for funding: <br />1St priorities <br />• Bridges (3) <br />• Creek restoration (8) <br />• 90' baseball field (3) <br />• Natural Resource (7) <br />• Relocate crosswalk <br />• Natural Space Preservation (5) <br />• Removal of concrete floodway (24`" to 19t" st) <br />• Multi- Use fields (17) <br />• Pavement removal <br />• Acquire additional land <br />• Dog park amenities <br />• Tennis court plantings <br />• Restroom <br />2"d priorities <br />• Bridge (7) <br />• Sidewalk additions <br />• Winterize pool (2) <br />• Native plant buffer <br />• Multi-use fields <br />• Dog park improvements (5) <br />• Acquire land (2) <br />• Wetland mitigation <br />• Restroom (4) <br />• Adidas trail improvements (2) <br />• Parking <br />• Benches (2) <br />• Relocate athletic fields <br />Amazon Park 11/20/03 <br />.Workshop 2 Questionnaire Results Page 4 <br />