New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Amazon Park Concept Design
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
Amazon Park Concept Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 10:55:29 AM
Creation date
6/1/2009 12:25:09 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
POS
PWA_Project_Area
Miscellaneous
PW_Subject
Amazon Park
Document_Date
2/15/2005
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Flexible fields. <br />• Efforts to restore native plants, protect wetlands, ash grove, and creek meander. <br />• I will only support additional parks measures when the city abandons the WEP <br />and overbuilding natural areas. <br />• Creek profile/ meander revisions. <br />• Increased sidewalks. Unlocked restroom. Pool open all year. <br />• Access across Amazon Parkway. Pedestrian bridge. Landscaping, winterize <br />pool <br />• Natural enhancements. Extend to east side of creek too (running trail). <br />• Open space improvements <br />• Wetland restoration. <br />• That there is still a place for sports fields. <br />• Natural resource improvements. <br />• General improvements and natural resource projects. <br />• Increase of native plantings. <br />• Improved access (Hilyard crossing, foot bridge, parkway crossing). Creek profile/ <br />meander provisions. <br />5) Since limited funding is available, please list your top 3 priorities for funding: <br />1St priorities <br />• Bridges (3) <br />• Creek restoration (8) <br />• 90' baseball field (3) <br />• Natural Resource (7) <br />• Relocate crosswalk <br />• Natural Space Preservation (5) <br />• Removal of concrete floodway (24`" to 19t" st) <br />• Multi- Use fields (17) <br />• Pavement removal <br />• Acquire additional land <br />• Dog park amenities <br />• Tennis court plantings <br />• Restroom <br />2"d priorities <br />• Bridge (7) <br />• Sidewalk additions <br />• Winterize pool (2) <br />• Native plant buffer <br />• Multi-use fields <br />• Dog park improvements (5) <br />• Acquire land (2) <br />• Wetland mitigation <br />• Restroom (4) <br />• Adidas trail improvements (2) <br />• Parking <br />• Benches (2) <br />• Relocate athletic fields <br />Amazon Park 11/20/03 <br />.Workshop 2 Questionnaire Results Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.