CLATSOP COUNTY <br />Name: US 101: COLUMBIA RIVER (ASTORIA-MEGLER) BR #07949C Applicant: ODOT Key: 14183 <br />Hwy/St: OREGON COAST <br />R te• US-101 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />1.80 to 3.03 Design: <br />ACT/AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $35,218,000 Status: Const. scheduled to begin in 2010 Work type: Bridee <br />PAINT BRIDGE-JOINT PROJ WITH WSDOT/ODOT IS LEAD/WSDOT TO PAY 50%/COST SHOWN IS TOTAL <br />Name: US101: CAMP RILEA-SURF PINES RD UNIT 1 (GLENWOOD) Applicant: ODOT Key: 14864 <br />Hwy/St: OREGON COAST <br />R te• US-101 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />12.50 to 13.00 Design: <br />ACT/AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 2 000 000 Status: Env Doc sched. to begin in 2010 Work type: Modernization <br />DEVELOPMENT WORK TOWARD WIDENING IN GLENWOOD VILLAGE AREA <br />Name: US 101 AT BROADWAY ST & AVENUE U (SEASIDE) Applicant: ODOT Key: 14771 <br />Hwy/St: OREGON COAST <br />R te• US-101 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />ou . <br />Planning: <br />Milepoints: <br />21.04 to 22.1g Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 __._. <br />$200,000 2008 <br />$190,000 2008 <br />$60,000 2008 <br />$1,212,000 2010 STP $924,398 HSIP $167,656 <br />$0 <br />Description: Total: $1.662,000 Status: Const. scheduled to begin in 2010 Work type: Operations <br />TRAFFIC SIGNALS REBUILD/REPLACE & INTERSECTION IMPROVEMENTS Work type 2: Safe <br />Name: IRVING AVE: 19TH ST BRIDGE #07T01 (ASTORIA) Applicant: CITY OF ASTORIA Key: 16044 <br />Hwy/St: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />R te• -- <br />ou . <br />Planning: <br />Milepoints: <br />0.63 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$813,000 2012 HBP $729,505 <br />$20,000 2012 HBP $17,946 <br />$0 <br />$5,044,000 2013 HBP $4,525,981 <br />$0 <br />Description: Total: 5 877 000 Status: Const. scheduled to begin in 2013 Work type: Bridle <br />REPLACE BRIDGE #07T01 <br />2010-213 DRAFT STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 73 <br />