LANE COUNTY <br />Name: OR569: RIVER RD - COBURG RD DEVELOPMENT Applicant: ODOT Key: 16223 '.,_ ~) <br />Hwy/St: BELTLINE <br />Route: OR569 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: ~ <br />Milepoints: Planning: <br />8.47 to 11.66 Design: <br />ACT/AREA: Land Purchase: <br />LANECO Utility Reloc: <br />Construction: <br />MPO: <br />CENTRAL LANE MP Other: <br />1 <br />~.. <br />Description: Total: $2,500.000 Status: Env Doc sched. to begin in 2013 Work type: Modernization :> <br />DEVELOPMENT WORK TO PREPARE FOR FUTURE MODERNIZATION <br />Name: OR126: BELTLINE HWY @ GREENHILL RD (EUGENE) Applicant: ODOT Key: 16106 <br />Hwy/St: BELTLINE <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR569 <br /> Planning: <br />Milepoints. <br />1.28 to 1,28 Design: <br />AC'I,/AREA: Land Purchase: <br /> Utility Reloc: <br />LANECO <br /> Construction: <br />MPO: <br />CENTRAL LANE MP Other: <br />$0 <br />$410,000 2011 STP $367,893 <br />$271,000 2012 STP $243,168 <br />$0 <br />$730,000 2013 STP $655,029 <br />$0 <br />ll~ <br />'._J <br />~- , .~ <br />;. <br />Description: Total: $1.411,000 Status: Const. scheduled to begin in 2013 Work type: Operations , -- -1 <br />REBUILD SIGNAL J <br />'~ <br />Name: OR225: MCVAY HWY @ 30TH AVE (EUGENE) Applicant: ODOT Key: 16107 r' ~ <br />Hwy/St: MCVAY `""" <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: ,~ <br />Route: OR225 <br /> Planning: <br />Milepoints: <br />2.19 to 2.19 Design: <br />AC.I./AREA: Land Purchase: <br /> Utility Reloc: <br />LANECO <br /> Construction: <br />MPO: <br />CENTRAL LAN E MP Other: <br />$0 <br />$337,000 2010 STP $302,390 <br />$360,000 2011 STP $323,028 <br />$0 <br />$786,000 2012 STP $705,278 <br />$0 <br />_') <br />l ~ ~~ <br />,,__.1 <br />~~~ - <br />Description: Total: $1,483.000 Status: Const. scheduled to begin in 2012 Work type: Operations <br />REBUILD SIGNAL `` <br />~',~ <br />Name: OR58: SALT CREEK TUNNEL - ODELL MAINT STATION Applicant: ODOT Key: 16132 : ~~ <br />Hwy/St: WILLAMETTE ` - `' <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: ~ -~ <br />Route: US101 <br />Planning: <br />Milepoints: <br />56.18 to 64.24 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />LANECO <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$390,000 2010 STP $349,947 <br />$6,000 2011 STP $5,384 <br />$0 <br />$6,635,000 2012 STP $5,953,586 <br />$0 <br />1 <br />(._i <br />`.._.. <br />Total: 7 031 000 Status: Const. scheduled to begin in 2012 Work type: Pavement Preservation t. j <br />Description: <br />INLAY/OVERLAY <br />.; <br />Name: OR126: CEMETERY RD -HORSESHOE CR Applicant: ODOT Key: 16133 <br />Hwy/St: FLORENCE-EUGENE 1/ <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: ,_ <br />Route: OR126 <br /> Planning: <br />Milepomts. <br /> <br />1.51 to 7.10 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />LANECO <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />~,. <br />-. -_,, <br />(. i <br />Description: Total: $4,828,000 Status: Const. scheduled to begin in 2012 Work type: Pavement Preservation ~ <br />4" OVERLAY r_._.1 <br />~ ~ <br />2010-2013 DRAFT STIP ~'~'WW.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 74 <br />