New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2010-2013 STIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2010-2013 STIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:52 AM
Creation date
6/1/2009 12:22:14 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
10/1/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CLATSOP COUNTY <br />Name: US26: WEST HUMBUG CREEK BR #01831 Applicant: ODOT Key: 16037 `'.___~ <br />Hwy/St: SUNSET <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: ~ <br />Route: US-26 <br /> Planning: <br />Milepoints: <br />16.27 to 16.29 Design: <br />ACT/AREA: Land Purchase: <br />NWACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$103,000 2011 HBP $92,422 <br />$0 <br />$59,000 2012 HBP $52,941 <br />$271,000 2013 HBP $243,168 <br />$0 <br />. l <br />. ~ <br />l <br />~~ <br />Description: Total: 433 000 Status: Const. scheduled to begin in 2013 Work type: Bridge > 1 <br />REPAIR POOR TIMBER SUBSTRUCTURE; REPAIR SCOUR UNDERMINING OF BENT 2; BRIDGE 01831 ~ <br />1 <br />Name: US30 @ KNAPPA, SVENSEN & TONGUE POINT FLASHERS Applicant: ODOT Key: 14779 i ) <br />Hwy/St: LOWER COLUMBIA RIVER 1 <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: 1 <br />Route: US-30 <br /> Planning: <br />Milepoints. <br />82.01 to 95.08 Design: <br />AC.I./AREA: Land Purchase: <br /> Utility Reloc: <br />NWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$12,000 2009 <br />$0 <br />$0 <br />$237,000 2011 STP $212,660 <br />$0 <br />Description: Total: 249 000 Status: Const. scheduled to begin in 2011 Work type: Operations <br />REPLACE FLASHERS <br />Name: US30: JOHN DAY RBRIDGE-33RD ST (ASTORIA) Applicant: ODOT Key: 14746 (.. <br />Hwy/St: LOWER COLUMBIA RIVER <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: i':: <br />Route: US-30 <br /> Planning: <br />Milepoints: <br />92.30 to 97.07 Design: <br />AC.I./AREA: Land Purchase: <br /> Utility Reloc: <br />NWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />i <br />i <br />Description: Total: 3 122 000 Status: Const. scheduled to begin in 2010 Work type: Pavement Preservation (,_ <br />OVERLAY <br />...i <br />Name: US30: ROCK CREEK CULVERT (FISH PASSAGE) Applicant: ODOT Key: 15030 C ; ~ <br />Hwy/St: LOWER COLUMBIA RIVER <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US-30 <br /> Planning: <br />Milepoints: <br />79.26 to 79.35 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />:) <br />.~ <br />~__ .. <br />~~ i <br />___.~ <br />i <br />~..., <br />Description: Total: 3 147 000 Status: Const. scheduled to begin in 2011 Work type: Salmon Restoration <br />~.. <br />REPLACE CULVERT WITH BRIDGE <br />~~ l <br />Name: US101: NECANICUM RIVER (SKIBERENE) BR #01481 Applicant: ODOT Key: 14802 <br />Hwy/St: OREGON COAST ~---- <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US-101 <br /> Planning: <br />Milepoints: <br />24.00 to 24.20 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NWACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$263,000 2009 <br />$6,000 2010 HBP $5,384 <br />$1,000 2010 HBP $897 <br />$2,652,000 2011 HBP $2,379,640 <br />$0 <br />~' <br />~,. , <br />_~ <br />~- ' <br />Description: Total: $2.922.000 Status: Const. scheduled to begin in 2011 Work type: Bridge <br />WIDEN BRIDGE; REPAIR CRACKS IN GIRDERS, CAPS & COLUMNS; SCOUR PROTECTION 1. _..' <br />\. <br />2OlO-2013 DRAFT STIP WWWOregon.gov/ODOT/HWY/STIP/ to download and/or search Page 72 !< <br />
The URL can be used to link to this page
Your browser does not support the video tag.