UMATILLA COUNTY <br />-_ <br />Name: OR334: ATHENA MAIN STREET IMPROVEMENTS Applicant: ODOT Key: 14678 <br />Hwy/St: ATHENA-HOLDMAN <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-334 <br /> Planning: <br />~~~~. <br />17.17 to 17.49 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$843,462 <br />Description: Total: $1.000.000 Status: Const. scheduled to begin in 2013 Work type: Pavement Preservation <br />PAVE MAIN STREET BETWEEN FIRST STAND SIXTH ST, <br />Name: OR11: WESTON BRIDGE -MILTON FREEWATER Applicant: ODOT Key: 16013 <br />Hwy/St: OREGON -WASHINGTON <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-11 <br /> Planning: <br />Milepoints: <br />20.40 to 26.93 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$281,000 2010 STP $252,141 <br />$0 <br />$0 <br />$5,092,000 2012 STP $2,330,216 STP $2,238,835 <br />$0 <br />Description: Total: 5 373 000 Status: Const. scheduled to begin in 2012 <br />PAVEMENT PRESERVATION <br />Work type: YavementYreservatton <br />Name: OR207: UMATILLA RIVER (HINKLE) BR #02318A Applicant: ODOT Key: 16023 <br />Hwy/St: HERMISTON <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: OR-207 <br /> Planning: <br />Milepoints: <br />11.80 to 11.90 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$1,179,000 2011 HBP $1,057,917 <br />$96,000 2011 HBP $86,141 <br />$0 <br />$7,107,000 2013 HBP $6,377,111 <br />$0 <br />Description: Total: $8,382,000 Status: Const. scheduled to begin in 2013 Work type: Bridee <br />REPLACE BRIDGE #02318A <br />Name: US730: UMATILLA RIVER (UMATILLA) BRIDGE #00624A Applicant: ODOT Key: 14830 <br />Hwy/St: COLUMBIA RIVER <br />Total Cost: Year: 1st Fund: Share: 2nd_ Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US-730 <br /> Planning: <br />Milepoints: <br />182.50 to 182.7 0 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NEACT <br /> Construction: <br />MPO, <br /> <br />Non-MPO Other: <br />$0 <br />$210,000 2009 <br />$65,000 2010 HBP $58,325 <br />$45,000 2009 <br />$1,566,000 2011 HBP $1,405,172 <br />$0 <br />Description: Total: $1,886,000 Status: Const. scheduled to begin in 2011 Work type: Bridee <br />DECK OVERLAY; JOINT REPAIR; BEARING REPLACEMENT; GIRDER & FLOOR BEAM REPAIR <br />Name: US730: POWERLINE ROAD INTERSECTION IMPROVEMENTS Applicant: ODOT Key: 16009 <br />Hwy/St: COLUMBIA RIVER <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US-730 <br /> Planning: <br />Milepoints: <br />182.53 to 182.54 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$81,000 2010 STP $72,681 <br />$100,000 2010 STP $89,730 <br />$0 <br />$638,000 2013 STP $572,477 <br />$0 <br />Description: Total: 819 000 Status: Const. scheduled to begin in 2013 Work type: Operations <br />RECONNECT ROAD AND REALIGN. <br />210-213 DRAFT STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 155 <br />