UNION COUNTY <br />Name: I-84: GLOVER INTERCHANGE - ORO DELL Applicant: ODOT Key: 16021 <br />Hwy/St: OLD OREGON TRAIL <br />• I 84 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />248.55 to 260 .25 Design: <br />ACT/AREA: Land Purchase: <br />NEACT Utility Reloc: <br /> Construction: <br />IVII'O: <br />Non-MPO Other: <br />Description: Total: $29.550.000 Status: Const. scheduled to begin in 2012 Work type: Pavement Preservation <br />INTERSTATE MAINTENANCE <br />Name: REGION 5 FISH PASSAGE Applicant: ODOT Key: 16020 <br />Hwy/St: OLD OREGON TRAIL <br />• I 84 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />270.89 to 271 .00 Design: <br />ACT/AREA: Land Purchase: <br />NEACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $1,600,000 Status: Land Purchase 2011 Work type: Salmon Restoration <br />REPLACE CULVERT UNDER INTERSTATE. Work type 2: <br />Name: OR82: IMBLER STORMWATER AND PED IMPROVEMENTS Applicant: ODOT Key: 14672 <br />Hwy/St: WALLOWA LAKE <br />• OR 82 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />11.97 to 12.41 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$200,000 2008 <br />$375,000 2009 <br />$230,000 2009 <br />$1,215,000 2010 STP $686,838 BIKPED $425,250 OTHER $24,300 <br />$0 <br />Description: Total: $2,020,000 Status: Const. scheduled to begin in 2010 Work type: Modernization <br />CONSTRUCT DRAINAGE SYSTEM, SIDEWALKS, GUTTERS, CURBS Work type 2: Bicycle/Pedestrian <br />Name: US30: GRANDE RONDE R & UPRR (ORO DELL) BR #08431 Applicant: ODOT Key: 14831 <br />Hwy/St: LA GRANDE-BAKER <br />• US 30 Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. - <br />Planning: <br />Milepoints: <br />0.09 to 0.63 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />NEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$243,000 2009 <br />$95,000 2010 HBP $85,244 <br />$0 <br />$2,288,000 2011 HBP $2,053,022 <br />$0 <br />Description: Total: 2 626 000 Status: Const. scheduled to begin in 2011 Work type: Bridee <br />DECK OVERLAY; JOINT REPAIR; RAIL RETROFIT; BOX GIRDER & CONCRETE CAP REPAIR <br />Name: REGION 5 FISH PASSAGE RESERVE Applicant: ODOT Key: 15402 <br />Hwy/St: OLD OREGON TRAIL <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: Var <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />VARIOUS <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 230 000 Status: Const. scheduled to begin in 2010 Work type: Salmon Restoration <br />POOL <br />201-2013 DRAFT STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 156 <br />