MORROW COUNTY <br />Name: SPERRY ST: WILLOW CREEK EB BRIDGE #49B11 Applicant: CITY of HEPPNER Key: 16052 <br />xwyist: <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route. -- <br />Planning: <br />Milepoints: <br />0.00 to 0.00 Design: <br />ACT/AREA: Land Purchase: <br />NEACT Utility Reloc: <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$137,000 2012 HBP $122,930 <br />$9,000 2012 HBP $8,076 <br />$0 <br />$661,000 2013 HBP $593,115 <br />$0 <br />Description: Total: 807 000 Status: Const. scheduled to begin in 2013 Work type: Bridge <br />REPLACE BRIDGE #49B11 <br />2010-2013 DRAFT STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search. Page 154 <br />