New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
2010-2013 STIP Draft
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
2010-2013 STIP Draft
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:13:52 AM
Creation date
6/1/2009 12:22:14 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
ODOT
PW_Subject
STIP
Document_Date
10/1/2008
External_View
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MALHEUR COUNTY <br />Name: I-84: N FORK JACOBSEN GULCH -IDAHO ST LINE (PH I) Applicant: ODOT Key: 16022 <br />Hwy/St: OLD OREGON TRAIL <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: I-84 <br /> Planning: <br />Milepoints. <br />368.16 to 378.01 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />SEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $8,359,000 Status: Const. scheduled to begin in 2013 Work type: Pavement Preservation <br />INTERSTATE MAINTENANCE <br />Name: US20/26: 11TH ST (NYSSA) -IDAHO STATE LINE Applicant: ODOT Ivey: 14680 <br />Hwy/St: CENTRAL OREGON <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US-20 <br /> Planning: <br />Milepoints. <br />265.40 to 266.61 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />SEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 673 000 Status: Const. scheduled to begin in 2010 Work type: Pavement Preservation <br />PAVEMENT PRESERVATION <br />Name: US20: LINCOLN AVENUE LEFT TURN LANES Applicant: ODOT Key: 16017 <br />Hwy/St: CENTRAL OREGON <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US-20 <br /> Planning: <br />Milepoints: <br />255.19 to 255.12 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />SEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />$0 <br />$145,000 2010 HSIP $133,719 <br />$256,000 2010 HSIP $236,083 <br />$76,000 2010 HSIP $70,087 <br />$1,010,000 2011 HSIP $931,422 <br />$0 <br />Description: Total: 1 487 000 Status: Const. scheduled to begin in 2011 Work type: Safe <br />CONSTRUCT LEFT TURN LANES AT INTERSECTION. <br />Name: US30: E IDAHO/WASHINGTON ST(ONTARIO) JURIS EXCHG Applicant: ODOT Key: 13616 <br />Hwy/St: OLDS FERRY-ONTARIO <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US-30 <br /> Planning: <br />Milepoints: <br />27.65 to 28.01 Design: <br />ACT/AREA: Land Purchase: <br /> Utility Reloc: <br />SEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: $1.403,000 Status: Const. scheduled to begin in 2010 Work type: Safe <br />PREPARATORY WORK FOR NRISDICTIONAL EXCHANGE. <br />Name: US95: ION CENTERLINE RUMBLE STRIPS Applicant: ODOT Key: 16018 <br />Hwy/St: I. O. N. <br />Total Cost: Year: 1st Fund: Share: 2nd Fund: Share: 3rd Fund: Share: Prior Yr: Share: <br />Route: US-95 <br /> Planning: <br />Milepoints: <br />0.00 to 121.36 Design: <br />ACT/AREA: L and Purchase: <br /> Utility Reloc: <br />SEACT <br /> Construction: <br />MPO: <br />Non-MPO Other: <br />Description: Total: 483 000 Status: Const. scheduled to begin in 2012 Work type: Safe <br />GRIND RUMBLE STRIPS INTO CENTERLINE. <br />2~1~-213 DRAFT STIP www.oregon.gov/ODOT/HWY/STIP/ to download and/or search Page 153 <br />
The URL can be used to link to this page
Your browser does not support the video tag.