New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2006 MWMC Budget and CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2006 MWMC Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:16:20 AM
Creation date
6/1/2009 12:21:04 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget and CIP
Document_Date
6/30/2006
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TERTIARY FILTRATION .I <br />Facility Process Component <br />Tertiary Filters <br />$12,076,000 <br />Total Cost <br /> PRIOR <br />Costs EXPEND- 2005-06 .2006=07 2007-08 2008-09* 2009-10 TOTAL <br /> ITURES <br />Construction 12 076,000 12 076,000 <br />TOTAL 0 0 0 0 12 076 000 0 12 076 000 <br />FUNDING SOURCE <br />Capital Reserve 0 10,676,000 0 10,676,000 <br />SDC Improvement Reserve 0 1,400 000 0 1 400,000 <br />TOTAL 0 0 0 0 12,076;000 0 12,076,000 <br />- Intlatetl from Z0o4 by 6.3% to FY05-06 dollars (Engineering News Record factor) and 4% thereafter <br />PROJECT: Tertiary Filtration Design and Construction <br />DESCRIPTION: Filtration: includes infrastructure/support facilities for 30 mgd of filters; install filter cells <br />sufficient for only 10 mgd. <br />JUSTIFICATION: An estimated 30 mgd of filters is required by 2010 to meet dry season mass limits. Facility <br />'Plan proposes phasing filters in sooner to facilitate development of Level 3 and Level 4 <br />reuse. Provides high quality secondary effluent and potential level 4 reuse water. Also, <br />needed to assist with meeting wet season mass load requirements during peak flow events <br />(under all peak flow management alternatives). <br />PROJECT DRIVER: Performance reliability. to meet the dry weather NPDES total suspended solids limits of less <br />than 10 mg/L, reuse development, and compliance with peak flow management. <br />PROJECT TRIGGER: NPDES permit compliance for TSS: Dry weather maximum month flow in excess of 49 mgd. <br />Also, initially to provide higher quality effluent so that reuse can be developed. <br />TYPE OF PROJECT: <br />ESTIMATED PROJECT COST <br />(FY 2004-05 Dollars): <br />INFLATED PROJECT COST <br />(Inflated Dollars -Multi-Vear): <br />PHASING: <br />25% Capacity; 75% Performance <br />$10,100,000 <br />$12,076,000 <br />Budgeted for FY 2008/09 <br />Page 74 FY OS-06 BUDGET AND C[P <br />
The URL can be used to link to this page
Your browser does not support the video tag.