New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2006 MWMC Budget and CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2006 MWMC Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:16:20 AM
Creation date
6/1/2009 12:21:04 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget and CIP
Document_Date
6/30/2006
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EFFLUENT REUSE 1 <br />Facility Process Component <br />Reuse Facilities <br />$2,764,000 <br />Total Cost <br /> <br />Costs PRIOR <br />EXPEND- . <br />ITURES <br />2005-05 <br />2006-07* <br />2007-08 <br />2008-09 <br />2009-10 <br />TOTAL <br />Construction 2 764,000 2 764 000 <br />TOTAL 0 0 2 764 000 0 0 0 2 764 000 <br />FUNDING SOURCE <br />Capital Reserve <br />2,764,000 <br />2,764 000 <br />TOTAL 0 0 2,764,000 0 0 0 2,764,000 <br />PROJECT: <br />DESCRIPTION: <br />JUSTIFICATION: <br />PROJECT DRIVER: <br />PROJECT TRIGGER: <br />TYPE OF PROJECT: <br />ESTIMATED PROJECT COST <br />(FY 2004-05 Dollars): <br />INFLATED PROJECT COST <br />(FY 2006-07 Dollars): <br />PHASING: <br />"Inflated from 2004 py 6.3% to FY05-06 aoilars (tnglneenng News Kecora racrorl ana 4"/o merear[er <br />Effluent Reuse I <br />Level 4 reuse system: Reuse disinfection, pumping, pipeline, and distribution/irrigation <br />system 2.5 mgd. <br />Implements Level 4 reuse so that thermal load is removed from the Willamette River. <br />Expansion of dry weather effluent reuse programs. Current NPDES thermal load <br />compliance. <br />Potential exceedance of NPDES thermal load limit. Identification of dry weather water <br />needs for potential clients. <br />100% Performance <br />$2,500,000 <br />$2,764,000 <br />Budgeted for FY 2006/07 <br />Page 75 FY 05-06 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.