New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
FY 2006 MWMC Budget and CIP
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
Historical
>
FY 2006 MWMC Budget and CIP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/21/2009 11:16:20 AM
Creation date
6/1/2009 12:21:04 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Wastewater
PWA_Project_Area
MWMC
PW_Subject
Budget and CIP
Document_Date
6/30/2006
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SODIUM HYPOCHLORITE CONVERSION <br />Facility Process Component <br />Dis infectio nlOutfall <br />$4,713,000 <br />Total Cost <br /> <br />Costs ~ PRIOR <br />EXPEND- <br />ITURES <br />2005-06 <br />2006-07 <br />2007::-08* <br />2008-09 <br />2009-10 <br />'TOTAL <br />Construction 4,713 000 4 713,000 <br />TOTAL 0 0 0 4 713 000 0 0 4 713 000 <br />FUNDING SOURCE <br />Capital Reserve <br />4 713 000 <br />4,713 000 <br />TOTAL 0 0 0 4,713,000 0 0 4,713,000 <br /> " Intlateq trOn1 ZUU4 dy ti.3% to t'YU9-U6 gollafS (tngmeerrng News Kecora Tac[orj ana w io tnereaner <br />PROJECT: Sodium Hypochlorite Conversion <br />DESCRIPTION: Convert existing chlorine gas system to sodium hypochlorite for the base flow. Retain the <br /> existing chlorine contact basins. Install system with capability for high rate disinfection of <br /> PE diversion assuming high dosages of chlorine into a 72-inch pipe and small chlorine <br /> contact basin. <br />JUSTIFICATION: Liquid sodium hypochlorite and sodium bisulfate system will replace the existing chlorine <br /> sulfur dioxide gas systems and increase the disinfection capacity from 175 mgd to 277 <br /> mgd. <br />PROJECT DRIVER: Operator and community safety issues. <br />PROJECT TRIGGER: Phasing with other related projects. <br />TYPE OF PROJECT: 50% Capacity; 50% PerFormance <br />ESTIMATED PROJECT COST $4,100,000 . <br />(FY 2004-05 Dollars): <br />INFLATED PROJECT COST $4,713,000 <br />(FY 2007-08 Dollard: <br />PHASING: Budgeted for FY 2007/08 <br />Page 73 FY OS-06 BUDGET AND CIP <br />
The URL can be used to link to this page
Your browser does not support the video tag.