development sites over 40 acres, the design storm shall be a 10 year storm event. <br />Permit holder The property owner, or easement holder or perlmttee ofrecord of the <br />pazcel or tax lot for which construction activities aze planned. <br />Person. An individual; trust, finm, joint stock company, joint venture, consortium, <br />commercial entity, partnership, association, corporation, commission, state and any agency <br />thereof, political subdivision ofthe state, interstate body or the federal government, including <br />any agency #hereo£ <br />Related natural resource areas. Areas located within or adjacent to the City's <br />stormwater system, such as waterways, wetlands, conservation zones or easements, and <br />riparian areas, which due to their location, topography, vegetation, or other factors provide <br />one or more of the. following stormwater functions: flood control, habitat, streambank <br />stab~7ization, and water quality treatment including pollutant removal, shading and <br />temperature stabl7ization. <br />Responsl`ble person or responsl'ble party. A permit holder, property owner, or their <br />agent or contractor, or other person who is responsible for meeting the outcomes, or <br />responsible for violation of this Rule. <br />Routine maintenance. Activities and practices that are necessary to maintain the <br />• .operating .capacity, functional integrity, or aesthetics of . a place or fac>7ity. Routine <br />~. maintenance includes, but is not liitrited to, landscaping, repair ofrecreation facilities (e.g., <br />ball diamonds, play areas, fields), cleanuig of stormwater facilities, and patching of streets. <br />Secondary contaimnent. On-site erosion prevention measures that include both a <br />preventative measure (soil coverage, vegetative buffer) and a control. measure (sediment <br />fence, mulch berm, straw bales). <br />Sedimentation. The deposit of mud, sand, soil, sediment or construction materials <br />exceeding one-half cubic foot in volume for every 1,000 squaze feet oflot size onto adjacent <br />properties, into the City's stormwater system, onto Related Natural Resource Areas located <br />on site, into public rights gfway or private streets, and/or into, any private stormwater system <br />that discharges into a City stormwater system located off-site by .dropping, dischaigiilg, <br />directly depositing, or resulting from the action of erosion. <br />Sensitive area. Sites that meet the criteria contained in R-6.645-E.1. <br />Template. An example of a construction site management plan provided by the City <br />of Eugene that -when modified by the erosion prevention permit holder to address site <br />specificconditions - can be used to satisfy CSMP requirements for a single dwelling or duplex <br />dwelling. The template maybe prepared by the permit holder or the permit holder's designee. <br />Administrative Rule - 7 <br />C:CI'I;MY~D3t;msicmYcev-2xo.wpd <br />