2.C.1 Application. <br />Application to use the public way under a revocable permit maybe made to the staff of the City <br />Engineer at the Permit and Information Center at 99 West 10th Avenue, Eugene, OR 97401. <br />2.C.2 Plans and Drawings. <br />Due to the large variety of uses for revocable permits, the plans and drawings required for a permit <br />will be addressed on a case-by-case basis. Typically, in addition to required plans and drawings, a <br />legal description must be provided of the property associated with the private facility proposed to <br />be placed in the public way. Contact the staff of the City Engineer for specific requirements. <br />2.C.3 Review. <br />Engineering Division personnel have the responsibility of entering the permit information into a <br />permit tracking system, routing the applications to the various reviewing divisions, and then issuing <br />the permit, issuing the permit with conditions, or denying the permit. If aright-of--way cut or work <br />permit is required in addition to the revocable permit, the right-of--way cut or work permit must be <br />reviewed and approved by the Inspector from Maintenance Planning prior to the issuance of the <br />revocable permit. <br />The amount of time needed by the City to review a revocable permit varies greatly depending upon <br />the complexity of the individual permit situation. <br />A copy of all issued permits shall be forwarded to the Inspector in Maintenance Planning to allow <br />inspection of the right-of--way restoration and temporary traffic control measures used. <br />2.D Street and Right-of--Way Work Permits. <br />Z.D.1 Application. <br />For franchised utilities, City-licensed telecommunication and facility operators, and municipal <br />utilities, application to perform work within the public way shall be made to the Maintenance <br />Division at 1820 Roosevelt Boulevard, Eugene, OR 97402. All other applicants for permits to <br />perform work in the public way shall make their applications through Public Works staff at the <br />Permit and Information Center at 99 West l Ot'' Avenue, Eugene, OR 97401. Applications shall be <br />made on a standard form provided by the City. All applicable portions of the application form and <br />standard attachments must be completed prior to submittal to the City. Incomplete applications will <br />not be processed and will be returned to the applicant for completion and re-submittal. <br />Application for a permit to perform work in the right-of--way must be made by a representative of <br />Utility & R/W Permit Manual <br />Exhibit A - 12 <br />C:\WINDOWS\Temporary Internet Files\OLKB202\03rowrlexa.wpd -Manual (03ROWR 1).WPD(11/07/03) <br />