5. Providers have the option of obtaining individual,right-of--way cut permits for each excavation activity <br />performed within the right=of--way or obtaining an annual blanket permit which covers .many activities <br />associated with maintenance and minorinstallationswithintheright-of--way. The regulations pertaining to <br />the. annual blanket permit program are contained within Administrative Rule R-7.302-A-2. _ <br />_'. <br />6. Individual Permit Costs for collector streets and alleys aze charged the same as local streets. <br />7. Individual Permit Costs for Public Utility Easements (PUE) abutting street right-of--way shall be chazged <br />at the same rate as if the placement had been in that right-of--way. PUEs not abutting street right-of--way <br />~~ shall be charged at the rate for local streets. <br />Other: <br />Exception permit for cutting street. less .than five yeazs old: $1,000 <br />Exhibit A - 2 <br />C:\WIlVDOWS\TEMP\Ol UtilityROW-ExA.wpd <br />_ _ <br /> <br />