UTILITY RIGHT-OF WAY USE PERNHT FEES <br />(Effective upon signature of final Administrative Order <br />. and January 1, 2003). <br />,'~innual "Blanket" Permits: <br />Processing . <br />-Calendar year 2002 ............... ................... ... $440.00. per permit <br />-Calendar year 2003 ........................................ $480.00 per permit <br />Inspection <br />-Calendar year 2002 ......:.....:................. ....... $75.00 per each Provider activity <br />-Calendar year 2003.:...... , ............................. $100.00 per each Provider activity <br />Individual Permit Costs: <br />Joint Trench 1 Facili 2 Facilities 3 Facilities 4 Facilities <br />Street Tyae Local Arterial Local Arterial Local Arterial Local Arterial <br />Projects less than 100 ft. <br />-Calendar year 2002 ...... $250 $300 $160 $190 $140 $165 $130 $155 <br />-Calendar year-2003..... $335 $395 $220 $260 $195 $231 $190 $225 <br />Projects from 100 to 499 ft. <br />-Calendar year 2002..... $310 <br />- $335 $200 $245 $170 $205 $155 $190 <br />-Calendar year 2003 ..... $415 $440 $270 .$330 $240 $290 $225 $275 <br />~~ -- 'Projects from 500 to 999 ft. <br />-Calendar.year 2002..... $405 $48S $255 $310 $210 $260 $200 $230 <br />-Calendar year 2003..... $530 $640 $350 $420 $295 • $365 $285 $335 <br />Projects 1000 to 2000 ft. <br />-Calendar year 2002..... $520 $650 $335 $410 $275 $335 $250 $305 <br />-Calendar year 2003..... $680 $845 $450 $555 $385 $470 $355. $440 <br />Additional Fees: <br />•Failure to maintain "approved plans" on work site at all times: $-100 per occurrence <br />•Deviation from "approved plans" without prior authorization of the Utility Inspector: $500 per occurrence <br />Notes• <br />1. • Projects greater than 2000 ft. in length will be charged the appropriate permit multiples equal to the length <br />of activity. <br />2. Failure to obtain aUtilityRight-of--Way Use Permit prior to commencing a work activity requiring the said <br />permit will result in a fee assessment equal to twice the original permit fee without the benefit of any joint <br />trench fee reduction. <br />3. Costs designated are for each facility within the joint trench. <br />4. The option of applying for an annual blanket permit is only available to Providers Franchised or Licensed <br />', by the City. <br />Exhibit A - 1 <br />C:\WINDO WS\TEMP\O I UtilityRO W-ExA.wpd <br />