New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
Admin Order 58-00-13-F (2)
COE
>
PW
>
Admin
>
Execs
>
Admin Orders
>
Admin Order 58-00-13-F (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2009 8:57:15 AM
Creation date
6/1/2009 12:08:51 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Administration
PWA_Project_Area
Admin Orders
PW_Subject
Construction
Document_Date
9/27/2000
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The following criteria shall apply to all Temporary Surfacing Permits: <br />Drainage and Maintenance Responsibilities - No permit will be issued without the applicant <br />providing a written statement which acknowledges that the maintenance of the facility and <br />the liability for any damage from drainage problems associated with the facility are the <br />permittee's private responsibility. <br />Work on Private Property - No permit will be issued which requires any work to be <br />performed on private property without a written statement granting the permission from the <br />owner of record. <br />Tree Removal - No trees shall be removed without the issuance of the Temporary Surfacing <br />Permit and the approval of the Urban Forester. <br />Designation of Street - No Temporary Surfacing Permit shall be considered for any public <br />right-of--way or easement which is a direct extension of a street designated as a major or <br />minor arterial or a major collector street as defined in the Eugene Arterial & Collector Street <br />Plan, dated November 1999. <br />2.IH.3 Criteria for Applicability for a TYPE ONE Tem~orary Surfacing Permit <br />A type one permit is for very small projects with very limited impact to the right-of--way or access <br />to abutting properties. <br />A type one permit may be used only: <br />(a) For the placement of dust pallative. <br />(b) For placement of less than 50 cubic yards of aggregate on an existing aggregate <br />roadway. <br />(c) For placement of less than 20 tons of asphalt concrete on an existing asphalt or <br />aggregate roadway. <br />2. A type one permit may not be used: <br />(a) To install any storm drainage facilities or underground utilities. <br />(b) To excavate over 12 inches in depth or place 12 inches of fill material. <br />(c) For any project on an unimproved section ofright-of--way. <br />2.H.4 Criteria for Applicability of a TYPE TWO Tem~orary Surfacing Permit <br />A type two permit is for more complex projects which may have significant impacts to the right-of- <br />way or access to abutting properties. No type two permit will be issued until proof has been <br />provided that all of the primary services have been extended through the work zone within the right- <br />Utility & R/W Permit Policy <br />EXlllblt A - 1 g r:\adminord\rules\OOrowrlexa.wpd(09/13/00) <br />
The URL can be used to link to this page
Your browser does not support the video tag.