11/20/01 <br /> I <br /> AFSCME CLASS REVIEWS <br /> i <br /> Class series to be reviewed (alpha) and # of employees: <br /> Administrative Aides (80) <br /> I Airport Worker series (15) <br /> Building Maintenance Coordinator (1) <br /> Building Maintenance Worker I & II (5) <br /> ~ Custodian & Lead Custodian (32) <br /> <br /> ~ Engineering Technician series (19) <br /> Gardener series (4) <br /> Graphic Design/Graphic Design Coordinator series (5) <br /> Maintenance Technician series (26) <br /> Maintenance Worker series (67) <br /> Park Specialist series (44) <br /> Recreation Leader series (7) <br /> <br /> li Traffic Control Worker series (6) <br /> Tree Trimmer series (7) <br /> Wastewater Maintenance Control Technician (2) <br /> Wastewater Technician series 40 <br /> ( ) <br /> Proposal for scheduling these reviews: <br /> Goals: Group related classifications together in one review <br /> Consider logical flow in scheduling (avoid duplicating work) <br /> Consider urgency of issues in scheduling. <br /> If possible, start with an area where some work has already been done <br /> (such as reviewing required licenses) <br /> 1) Building & Facility Positions <br /> -Airport Worker series <br /> -Bldg Maint Worker series & Bldg Maint Coord <br /> -Custodian & Lead Custodian <br /> -Fire Maintenance Worker <br /> -Park Spec & Gardener series <br /> -Tree Trimmer series <br /> General Equipment & Labor Positions <br /> -Maintenance Worker series <br /> -Traffic Control Worker series <br /> <br />