4. Perform a final inspection upon completion of the Section 1135 recreation facilities and prior <br />to processing final reimbursement payment to the City. <br />5. Review any contract change orders administered by the City for any significant changes to <br />the facilities previously designed by the Corps. <br />The City of Eugene Will: <br />1. Administer the contract for construction of the planned recreation facilities at the Amazon Creek <br />Wetlands Section 1135 Project. Recreation facilities to be constructed by the city using Section <br />1135 funding are summarized below. All facilities will be constructed in accordance. with the <br />detailed plans and specii:ications previously prepared by the Corps and provided to the City. <br />Estimated costs for the separable facilities were derived from the Corps' Baseline cost estimate for <br />the project and include contingencies (September 2000). ' <br />a. .Greenhill Road Overlook. An overlook adjacent to Greenhill Road with covered <br />viewing area structures, interpretive displays,.parking, sanitary facilities and <br />landscaping. <br />Estimated Cost: <br />$245,900 <br />b. Greenhill Multiple Purpose Path. Approximately 2,200 linear feet of paved multi-use <br />path along the relocated levee adjacent to Greenhill Road connecting the overlook <br />site~t~ the Eern midge B~e~ i'atir:~- -- <br />Estimated Cost: $267,200 <br />c. Terry Street Multiple Purpose Path. Approximately 1,5001inear feet of paved multi- <br />use path along the relocated levee connecting providing access across the project area <br />Estimated Cost: <br />$224,800 <br />d. Royal Avenue Multiple Use Path. Approximately 4001inear feet of paved multiple <br />use path from an access point along Royal Avenue adjacent to the Amazon Channel <br />Estimated Cost: <br />$52,900 <br />e. Royal Avenue Parking Lot. A small parking lot and access point off of Royal <br />Avenue with interpretive displays. <br />Estimated Cost: <br />$69,700 <br />f. Mobilization and demobilization. Miscellaneous mobilization and demobilization for <br />the construction of the Section 1135 recreation facilities. <br />Estimated Cost: <br />Estimated total construction cost <br />2 <br />$23,400 <br />$884,000 <br />