New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
GJN3828 Grant File
COE
>
PW
>
Admin
>
Finance
>
Capital
>
2008
>
GJN3828 Grant File
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2009 3:08:18 PM
Creation date
1/2/2009 9:15:57 AM
Metadata
Fields
Template:
PW_Capital
PW_Document_Type_Capital
Admin Documents
PW_Active
Yes
External_View
No
GJN
003828
GL_Project_Number
905254
Identification_Number
Fern Ridge Bike Gran
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TASK ORDER 02-2 <br />CONSTRUCTION OF RECREATION FACILITIES AT AMAZON CREEK WETLANDS <br />RESTORATION PROJECT <br />References: <br />1. Cooperative Agreement (Amendment No. 1, September 28, 2001, enclosure 1) between the <br />U.S. Army Corps of Engineers (Corps), Portland District and the City of Eugene, Oregon, (the <br />City) for acquisition of native plants and seeds and construction of recreation facilities at the <br />Amazon Creek Wetlands Restoration, Section 1135 Project <br />2. Project Cooperation Agreement (Amendment No. 1, September 21, 2001, enclosure 2) between <br />the Department of the Army and the City of Eugene, Oregon, for Modification of Amazon Creek <br />Flood Control Channel, Amazon Creek Wetlands Restoration <br />Requesting Agency: U.S. Army Corps of Engineers, Portland District <br />Servicing A encX: City of Eugene, Oregon <br />Description of Services: Under this task order the City of Eugene will construct the planned <br />recreation facilities at the project as described in the Project Cooperation Agreement (PCA, reference <br />2 above). The recreation facilities will support public access and provide environmental education <br />and interpretive opportunities in keeping with the primary wetland restoration purpose of the project <br />inclusion in a larger contract that the city is administering for the Eugene to Fern Ridge multiple <br />purpose u ail. i ne conrraci was previously awaraea ny vregon lieparrment of t ranspor[anon in <br />2001. Construction will be initiated in summer of 2002 and will continue through 2003. The city <br />will manage the construction contract and will complete construction of all facilities with Section <br />This Task Order covers work to be completed in Federal Fiscal Year (FY) 2002. A separate task <br />order will be prepared to cover work completed in FY 2003. <br />Tasks and Activities: <br />The Corps of Engineers Will: <br />1. In accordance with the cost-sharing provisions detailed in the Project Cooperation Agreement <br />(PCA), reimburse the City for the Federal share of the recreation facilities constructed by the city. <br />The Federal share is described below under "Reimbursement of Services" <br />2. Provide any additional engineering during construction that may be required for the facilities <br />previously designed by Corps staff. <br />3. Perform interim inspections (roughly twice monthly) during active construction periods. The <br />purpose of the inspections is to provide quality assurance on those facilities for which the Corps <br />will share costs. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.