New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
State Transportation Gov Report
COE
>
PW
>
Admin
>
Finance
>
Operating
>
2009
>
State Transportation Gov Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/28/2010 12:53:16 PM
Creation date
11/10/2008 2:13:03 PM
Metadata
Fields
Template:
PW_Operating
PW_Document_Type_ Operating
Reports
Fiscal_Year
2009
GL_Fund
131
GL_ORG
8990
Identification_Number
State Tran Rpt 11/08
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
11 1 1 1 <br /> ~ ~ 11 1 ~ I ~ 1 <br /> Region Project Name Route Description Cost <br /> <br /> 2 Replace 5 traffic Hwy 1W Signals are old. Intercon- <br /> signals and signal nect system is old AC type. <br /> interconnect Signals and interconnect <br /> at Adams/2nd, have had numerous re- <br /> Baker/2nd, pairs over the years. Pole at <br /> Baker/3rd, Adams/2nd keeps is severe- <br /> Adams/12th, ly damaged due to repeated <br /> Baker/12th hits from trucks. A 6th signal <br /> (Adams/4th) is currently on <br /> STIP for rebuilding. <br /> <br /> 2 VMS replacement OR 18 Replace existing VMS at $1,200,000 <br /> OTIS and at Wallace Bridge. <br /> Existing signs are at end of <br /> life and parts are not avail- <br /> able. <br /> <br /> 2 Signal upgrades Various Upgrade to 2070 Controllers, $800,000 <br /> install signal interconnect, <br /> flashing yellow arrow con- <br /> version. <br /> <br /> 2 Replace traffic Hwy 33 Span wire signal needs to $2,000,000 <br /> signal and add be replaced. Current signal <br /> southbound trav- operation is split phased on <br /> el lane at John- side street. Need to add at <br /> moore/Harney least one southbound lane <br /> and reassign lane use to <br /> make intersection more ef- <br /> ficient. <br /> Region 2 subtotal $17,360,000 <br /> Region Project Name Route Description Cost <br /> <br /> 3 I-5 SB Off-Ramp US 199/ This intersection is a top $1,600,000 <br /> at US 199 6th & OR 5% SPIS location for several <br /> Morgan (Grants 99/6th years. It has unusual geom- <br /> Pass} etry and operational/safety <br /> problems associated with it. <br /> The signal system is old and <br /> needs to be replaced. <br /> <br /> 3 Region 3 signal Various Old signals, repeated main- $1,600,000 <br /> upgrades tenance problems, potential <br /> liability issues due to failure. <br /> <br /> 3 Region 3 ITS Various Road weather information $1,200,000 <br /> installations systems and ITS systems <br /> necessary to inform <br /> travelers. <br /> 43 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.