11 1 1 1 <br /> ~ ~ 11 1 ~ 1 ~ 1 <br /> Region Project name Route Description Cost <br /> <br /> 2 LED replacement Various Upgrade existing LED and re- $300,000 <br /> place incandescent signal head <br /> displays with new LED displays <br /> <br /> 2 Solar school Various Remove power source from $60,000 <br /> flashers power lines to eliminate <br /> meters and power costs to <br /> existing school flashers. <br /> Install wireless communica- <br /> tion between flasher displays <br /> controlling opposite directions <br /> of traffic. <br /> <br /> 2 Replace traffic Hwy 140 Pole in SW quadrant severely $1,000,000 <br /> signal at damaged from repeated hits <br /> Evergreen from trucks. Sidewalk ramp <br /> is severely damaged due to <br /> truck off-tracking. R/W needed <br /> to relocate poles to offset <br /> truck off-tracking. This proj- <br /> ect is top priority on Electrical <br /> Manger list to replace. Can not <br /> wait for future I-5 interchange <br /> project funding. <br /> <br /> 2 Replace traffic Hwy 9 Replace old span wire in- $1,000,000 <br /> signal at Pacific stallation with mast arms. <br /> Way Upgradequadrantstocur- <br /> rent ADA standards. R/W is <br /> needed to install new poles <br /> and controller. <br /> <br /> 2 Replace traffic Hwy 9 Complex intersection for $3,000,000 <br /> signal and sign signing and signalizing. Ex- <br /> bridge at the end fisting traffic signal and sign <br /> of HWY 30 bridge are old and need up- <br /> dating. Also an ATR site. R/W <br /> constraints may exist requir- <br /> ing unique design features. <br /> Intersection illumination will <br /> need to be replaced. <br /> <br /> 2 Replace 3 traffic Hwy 9 Old signals need to be up- $3,000,000 <br /> signals at Pacific dated. <br /> Ave, 1st, 3rd and <br /> 4th <br /> 42 <br /> <br />