• • • <br /> ~ t • • • • <br /> Appendix E <br /> Highway Operations and Intelligent <br /> Transportation Systems Investment List <br /> <br /> The Vision Committee recommends an additional $10 million annual investment in <br /> Intelligent Transportation Systems and Operations to improve the capacity of the <br /> state highway system. The lists below identify 48 projects statewide totaling about <br /> $60 million. Projects would be selected from the lists during the first few years. <br /> Additional projects will be identified as the additional funding is integrated into the <br /> Statewide Transportation Improvement Program. <br /> Region Project name Route Description Cost <br /> 1 I-205 SB to I-5 SB I-5 Merge area is too short $4,000,000 <br /> Connector <br /> 1 VMS replacement Various Existing VMS are at the end $2,850,000 <br /> of life, are incompatible with <br /> existing standards, and have <br /> problems with parts availabil- <br /> ity. Locations: I-5 at Lombard, <br /> I-84 at 148th, I-84 at 28th, <br /> and I-5 at Iowa <br /> 1 Ramp metering Various dd ramp meters on I-84 east $2,000,000 <br /> of I-205 and a few locations <br /> on I-5 and I-205 <br /> 1 Chain condition US 26 Add remotely operated snow $500,000 <br /> signs zone signs near Mt. Hood <br /> 1 99W active corridor 99W Upgrade controllers and soft- $600,000 <br /> management ware, improved detection, add <br /> cameras and communications <br /> 1 Integrated corridor OR 224 Upgrade controllers and soft- $450,000 <br /> management - ware, improved detection, add <br /> SE Milwaukee cameras and communications <br /> Expressway <br /> 1 Sign replacements Various Replace and upgrade existing $4,000,000 <br /> signs <br /> 1 Signal interconnect Various Add signal interconnect to en- $2,000,000 <br /> able coordinated signal opera- <br /> tions <br /> 1 Illumination Various Replace illumination systems $3,000,000 <br /> replacement that have reached the end of <br /> their life cycle <br /> 1 Ramp meter Various Upgrade some ramp meter $358,000 <br /> controller upgrade controllers to 2070 controllers <br /> and remove remote loop amps <br /> Region 1 subtotal $19,758,000 <br /> 41 <br /> <br />