. <br />-~ . . <br />' UO Arena~Mifi ation; City Priorities <br />Cost Estimate des'ign scope and assumptions 08/Oi/2008 <br />5-0rchard at Franklin Blvd median and driveway reconstruction. <br />Scope: <br />Eliminate driveway into the Grocery parking lot adjacent to the intersection and constxuct <br />• new commercial driveway south of the intersection azea. Relocate existing LTD shelter. <br />Add landscaping in the street side planting strip. <br />Assumptions: <br />. ;' No on-street or utility improvements required. ' <br />Possible irrigation cost not included. <br />