~ <br />, <br />UO Arena Mitigation, City Priorities <br />4- Franklin Blvd. and Villard median and driveway reconfiguration <br />Construction Costs <br />0010 Mobilization <br />0020 Temporary Work Zone Tra~c Control - Complete <br />0030' Erosion Control <br />0040 Flagg'ing • <br />0050 Sawcutting <br />0060 Excavation <br />0070 Concrete Walk, 6" <br />0080 Concrete Driveway, 7 inch <br />0090 Concrete Curb and Gutter <br />0100 Concrete dowelled Paving, 10" <br />0110 Aggregate Base <br />012U Pavement Line <br />0130 Thermoplastic, Non-Prof, 120 Mii, Extruded ~ <br />0140 Truncated Domes Texturing <br />0950 Striping Removal <br />0160 Landscaping <br />Total Construc#ion <br />Testing (percent of construction) <br />Contingency (percent of construction) <br />Engineering (percent of construction, testing, continge <br />871 /2008 <br />Quanti Unit Unit Price Extended Total <br />1 ~S 15% of const $5,214.75 <br />1 LS $2,500.00 $2,500.00 <br />1 LS ~ $750.00. $750.00 <br />40 HOUR $40.00 $1,600.00 <br />300 LF. $1.50 $450.00 <br />130 CY $20.00 $2,600.00 <br />460 SF $6.75 $3,105.00 <br />210 SF $8.00 , $1,680.00 <br />275 LF $20.00 $5,500.00 <br />620 SF $20.00 $42,400.00 <br />40 TON $20.00 $800.00 <br />160 SF $5.00 $800.00 <br />1 LS ~ $500.00 $500.00 <br />40 SF ` $25.00 $1,000.00 <br />80 LF $1.00 $80.00 <br />1 LS $1,000.00 ~ $1,000.00 <br /> $39,979.75 <br /> 2% $799.60 <br /> 25% $9,994.94 <br />cy) 20% n <br />$10,154.86 <br />Total <br />Estimate Total - <br />$60,929.14 <br />$61,000 <br />