. <br />,..' ,, , , <br />UO Arena Miti~ation, City Priorities <br />Cost Estimate design scope and assurnptions 08/01/2008 , <br />4-Villard at Franklin Blvd median and driveway reconstruction. <br />Scope: <br />Reconstruct Villard Street median at Franklin Blvd. Provide median radius for truck <br />turning and eliminate median vehicle cut-through to ~rovide more queuing distance. <br />Eliminate driveway into the Grocery/Pharmacy parking lot adjacent to the intersection <br />and construct new common commercial driveway south of the intersection area. <br />Assumptions: ` <br />Remove and reconstruct Villard median with two new pedestrian'ramps. <br />Landscaped median. <br />No changes to traffic signal infrastructure. <br />Remove driveway into Grocery/Pharmacy and replace with sidewalk. <br />Construct new common commercial driveway south of current driveway. <br />Restripe crosswalks and turn lanes: <br />Possible irrigation costs not included. <br />