New Search
My WebLink
|
Help
|
About
|
Sign Out
New Search
UO Arena Mitigation
COE
>
PW
>
Admin
>
Execs
>
Executive non-confidential
>
2009
>
UO Arena Mitigation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2010 9:59:59 AM
Creation date
9/30/2008 2:14:13 PM
Metadata
Fields
Template:
PW_Exec
PW_Division_Exec
Executive Director
PWA_Project_Area
Development
PW_Subject
UO Arena Mitigation
Document_Date
8/1/2008
External_View
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. <br />,..' ,, , , <br />UO Arena Miti~ation, City Priorities <br />Cost Estimate design scope and assurnptions 08/01/2008 , <br />4-Villard at Franklin Blvd median and driveway reconstruction. <br />Scope: <br />Reconstruct Villard Street median at Franklin Blvd. Provide median radius for truck <br />turning and eliminate median vehicle cut-through to ~rovide more queuing distance. <br />Eliminate driveway into the Grocery/Pharmacy parking lot adjacent to the intersection <br />and construct new common commercial driveway south of the intersection area. <br />Assumptions: ` <br />Remove and reconstruct Villard median with two new pedestrian'ramps. <br />Landscaped median. <br />No changes to traffic signal infrastructure. <br />Remove driveway into Grocery/Pharmacy and replace with sidewalk. <br />Construct new common commercial driveway south of current driveway. <br />Restripe crosswalks and turn lanes: <br />Possible irrigation costs not included. <br />
The URL can be used to link to this page
Your browser does not support the video tag.